Skip to main content

New flyover for Pune, India

A new flyover in Pune, India is helping traffic flow, easing congestion in the city Work commenced on the Bharatratna JRD Tata double deck flyover in mid-2010 and now that the structure is carrying traffic, the city’s previous chronic congestion problem has eased significantly.
June 30, 2014 Read time: 2 mins
Pune’s new flyover was officially inaugurated recently by by India’s Deputy Chief Minister, Ajit Pawar
A new flyover in Pune, India is helping traffic flow, easing congestion in the city

Work commenced on the Bharatratna JRD Tata double deck flyover in mid-2010 and now that the structure is carrying traffic, the city’s previous chronic congestion problem has eased significantly.

In July 2010, work began on the double-decker flyover, an impressive construction that will make a substantial contribution to reducing traffic congestion in the Pune area. During the concreting phase of the project, equipment from 161 Atlas Copco was used to give a smooth surface finish and the desired strength to the casting. The flyover was inaugurated in February this year by India’s Deputy Chief Minister, Ajit Pawar.

The Bharatratna JRD Tata flyover is located in Kasarwadi at the critical junction where the Pune-Nashik highway meets the Mumbai-Pune highway, this construction project cost was around US$17 million.

The contractor chosen for the project was Pune-based infrastructure specialist B G Shirke Construction Technology. At the site, located close to Atlas Copco India's head office in Dapodi, Pune, B G Shirke used many products from Atlas Copco's light compaction and concrete equipment range in the concreting process.

These included Vibrastar motor-in-head electric pokers, frequency converters, ER407B electric high-speed external
vibrators, and LP6500 walk-behind double drum rollers.

Vikas Sawhney, business line manager, Construction Tools, Atlas Copco India said, “The Bharatratna JRD Tata flyover opens up major potential for new infrastructure projects to modernise the Pune landscape. Atlas Copco is proud to be associated with this project, which will make the lives of Pune citizens much easier with increased connectivity and reduced travel time.”

For more information on companies in this article

Related Content

  • Atlas Copco introduces its Edge Drill Monitor at INTERMAT 2012
    January 6, 2017
    Atlas Copco is introducing the Edge Drill Monitor, which is designed to show what is happening at the bottom of the hole during drilling.
  • Atlas Copco introduces its Edge Drill Monitor at INTERMAT 2012
    February 2, 2012
    Atlas Copco is introducing the Edge Drill Monitor, which is designed to show what is happening at the bottom of the hole during drilling.
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno
  • What happens when you run out of land for roads?
    November 1, 2021
    Mumbai, the financial capital of India has a population of 12.4 million located in a small area of 437sq.km, surrounded by the sea with nowhere to expand. An increase in congestion on Mumbai’s roads has put a strain on the city’s infrastructure. The result has been long commute times with idling cars contributing to an alarming rise in poor air quality, impacting the quality of life for residents