Skip to main content

New flyover for Pune, India

A new flyover in Pune, India is helping traffic flow, easing congestion in the city Work commenced on the Bharatratna JRD Tata double deck flyover in mid-2010 and now that the structure is carrying traffic, the city’s previous chronic congestion problem has eased significantly.
June 30, 2014 Read time: 2 mins
Pune’s new flyover was officially inaugurated recently by by India’s Deputy Chief Minister, Ajit Pawar
A new flyover in Pune, India is helping traffic flow, easing congestion in the city

Work commenced on the Bharatratna JRD Tata double deck flyover in mid-2010 and now that the structure is carrying traffic, the city’s previous chronic congestion problem has eased significantly.

In July 2010, work began on the double-decker flyover, an impressive construction that will make a substantial contribution to reducing traffic congestion in the Pune area. During the concreting phase of the project, equipment from 161 Atlas Copco was used to give a smooth surface finish and the desired strength to the casting. The flyover was inaugurated in February this year by India’s Deputy Chief Minister, Ajit Pawar.

The Bharatratna JRD Tata flyover is located in Kasarwadi at the critical junction where the Pune-Nashik highway meets the Mumbai-Pune highway, this construction project cost was around US$17 million.

The contractor chosen for the project was Pune-based infrastructure specialist B G Shirke Construction Technology. At the site, located close to Atlas Copco India's head office in Dapodi, Pune, B G Shirke used many products from Atlas Copco's light compaction and concrete equipment range in the concreting process.

These included Vibrastar motor-in-head electric pokers, frequency converters, ER407B electric high-speed external
vibrators, and LP6500 walk-behind double drum rollers.

Vikas Sawhney, business line manager, Construction Tools, Atlas Copco India said, “The Bharatratna JRD Tata flyover opens up major potential for new infrastructure projects to modernise the Pune landscape. Atlas Copco is proud to be associated with this project, which will make the lives of Pune citizens much easier with increased connectivity and reduced travel time.”

For more information on companies in this article

Related Content

  • Guiding hand from Pexco
    February 9, 2012
    A lane separation system from Pexco is guiding more than 6,000 vehicles each day through changing traffic patterns.
  • New junction designs for Nairobi to cut congestion
    June 30, 2014
    New junctions could cut chronic congestion in Kenyan capital Nairobi – Shem Oirere reports Kenya plans to replace all T-junctions in the country’s capital Nairobi with acceleration and deceleration lanes to address a crippling vehicle traffic regime estimated to consume $580,000 daily. “We will replace the junctions with acceleration and deceleration lanes,” said John Mosonik, the principal secretary in Kenya’s ministry of transport. He said the acceleration lanes, which allow cars joining the main road t
  • Cifa gets pumped over final work on Milan bypass
    May 14, 2015
    Truck-mounted concrete pumps from the manufacturer Cifa have been working around the clock at one of Italy’s most prestigious road infrastructure projects, the Milan Outer Bypass. The toll motorway project, known by the TEEM acronym from the Italian name Tangenziale Est Esterna di Milano, involves 32km of new carriageway consisting of three lanes in each direction in addition to an emergency lane. The route winds through agricultural land and connects the A4 highway (Milano-Venezia) in the north to the A
  • Installation underway of first UK M4/M5 ‘superspan’ gantries
    July 4, 2012
    The installation is underway of the first superspan gantries on the M4/M5 managed motorway scheme. The existing gantries and infrastructure were successfully removed last month while the new steel gantries were being constructed, fitted-out and tested at a dedicated facility located near junction 17 of the M5, before being delivered to the works site. A total of 33 new overhead gantries, a number of which span 50m and weigh over 30tonnes, will be installed along the new managed motorway section up until T