Skip to main content

New CEO plans global expansion for Pilosio

The new CEO of Pilosio, Johann Strunz, has some ambitious expansion plans for the euro45m-turnover company. The former managing director of Doka’s Austrian business plans to decentralise the Italian formwork and falsework specialist, with hubs in various regions in addition to its Italian headquarters. “We are moving from being a head-quartered company to a decentralised structure,” said Strunz. “We want to give power to the markets. They will decide on the pace and the headquarters will define the quali
April 15, 2016 Read time: 2 mins
Pilosio’s tunnel formwork is a key offering
The new CEO of 7163 Pilosio, Johann Strunz, has some ambitious expansion plans for the euro45m-turnover company. The former managing director of 203 Doka’s Austrian business plans to decentralise the Italian formwork and falsework specialist, with hubs in various regions in addition to its Italian headquarters.

“We are moving from being a head-quartered company to a decentralised structure,” said Strunz. “We want to give power to the markets. They will decide on the pace and the headquarters will define the quality.”

Pilosio currently has two directly-owned branches in South Africa and Canada. A further three will be operating by the end of the year, says Strunz, the first of which will open shortly in Dubai. In tandem with the new hubs, Strunz wants to double the number of agents selling Pilosio equipment from 20 to 40. He expects the number of directly employed staff to remain at around 150.

The important markets for Pilosio and the Middle East, North and South America and Africa, said Strunz. “We are not focussed very much on Europe. We don’t expect big growth in the next two to three years, the competition is extremely high and the prices are low.” Currently 70% of Pilosio’s turnover comes from outside Europe, with most of the remaining 30% originating in its home market of Italy.

Strunz, who only took up his new post just before bauma began, has been impressed with the speed at which Pilosio is able to change. “I had my first meeting in March with Pilosio staff and in just two one-hour meetings, we changed the concept of the booth and the marketing appearance at bauma, and in less than a week it was realised,” he said. “That’s one of the strengths of being a small firm and something I want to preserve: the velocity, the fast reaction time and flexibility.”

For more information on companies in this article

Related Content

  • The new agile world of the construction equipment industry
    June 22, 2015
    while worldwide for 2015 a crystalball would be helpful, in Europe the sector has already listed specific priorities it wants to tackle, and among these are the upcoming emissions regulations (see separate story), external trade and access to foreign markets, and market surveillance.
  • India's first construction event a huge success
    February 13, 2012
    The first bC India event has exceeded all expectations and it is set to become a regular event. Patrick Smith reports A major new construction equipment show has been launched in a nation with a huge appetite for such machinery and a growth rate nudging 9% each year. With billions being spent on infrastructure (roads and highways, power stations, railways, ports and airports), India was a prime candidate for a trade fair to display the latest and local international construction machinery, building materia
  • Framework solutions speed bridge construction
    February 24, 2012
    Framework plays a key role in construction of bridges and other major infrastructure works – Mike Woof writes Speeding construction processes can help reduce costs considerably and the latest formwork solutions can provide significant benefits in this regard. In many projects the use of standardized and modular formwork solutions can play a key role, reducing the planning and systems required for bridge building work.
  • Asphalt airport runway refurbishment
    February 17, 2012
    Swedish contractor Peab Asfalt generally works on major road and highway projects in the inland portion of the country. However the company has shown itself able to take on a considerable challenge, by repaving an airport runway.