Skip to main content

A new asphalt plant in Cameroon

A Lintec CSM4000 containerised asphalt plant in Cameroon has helped with the construction of the country’s first-ever expressway linking its two largest cities, Douala and Yaoundé. The new route replaces an older roadway in use for over three decades that no longer met traffic needs.
January 27, 2023 Read time: 3 mins
A Lintec asphalt plant has played an important role in the construction of Cameroon’s first expressway

The 60km stretch of Phase 1 of the project was completed just in time for the 2021 Africa Cup of Nations football tournament, which took place in Yaoundé in early 2022.

The plant played a pivotal role in the construction of the expressway, connecting capital Yaoundé with its largest city, Douala, home to the region’s major airport and largest port.

The rapid growth of traffic on the old National Road No 3 had left it struggling to support the economic and population growth of the two cities. Once labelled the world’s sixth-most dangerous road, at one time it was even responsible for a third of the country’s crashes; the combined result of high traffic levels and neglected infrastructure.

A brand-new road was required and, in 2011, plans were confirmed for the construction of 196km of six lanes of dual carriageway, divided by a 5m-wide median strip. This would reduce the total travel distance between the two cities from 265km to 215km and allow the introduction of a 110km/h speed limit on the route.

In January 2015, China First Highway Engineering Company (CFHEC), a subsidiary of China Communications Construction Company, began work on Phase 1. This involved the construction of a 60km stretch between Yaoundé and Bibodi, plus 25km of access roads connecting it with National Road No3. At 98% progress in January 2022, the next step was to finalise construction of functional infrastructure, including five interchanges, nine toll booths, three rest areas, two service areas and 11 river crossings.

“This was such an important project that the government made opening up the 60km of Phase 1 a priority,” said Tony Liu, CEO, Lintec & Linnhoff China. “Progress had suffered from the frequent heavy rains and other setbacks.”

The mixing plant’s containerised design played an important role, protecting the working components from the harsh weather, reducing maintenance demands while also offering increased security by restricting access to just one lockable door.

The CSM4000 has an output of 320tonnes/hour of asphalt in batch sizes of 4tonnes and the containerised design enables it to be transported to other jobsites quickly. Each container houses the key components, enabling fast commissioning onsite. Offering fast erection and relocation times for large-capacity asphalt plants, these units require no concrete foundations to be prepared at the next destination due to their flat, rigid surface area ensuring high stability on compacted soil.

“It’s always rewarding to play a part in enabling such vital improvements to a country’s infrastructure,” concludes Tony. “The old National Road No 3 was slowing the country’s growth, and the problem was only worsening as it struggled to cope with rising traffic levels. Building Cameroon’s first expressway improved the lives of ordinary citizens through enhanced public safety, greater GDP and speeding up access between two major hubs.”

The cost of Phase 1 has been estimated at between US$441 million and $528 million. Phase 2 will be carried out under the PPP model for the remaining 136km to Douala at an estimated cost of $1.27 billion.

For more information on companies in this article

Related Content

  • Tarmac’s plan for cutting traffic disruption from roadworks
    October 19, 2020
    Tarmac has a cunning plan for cutting traffic disruption from roadworks.
  • The importance of road maintenance
    July 15, 2015
    Gülay Malkoc discusses the importance of investing in road maintenance.
  • Brazil’s slow urban mobility progress
    February 20, 2014
    Less than 20% of the announced urban mobility projects in Brazil have their work under way or have been concluded. The low volume is said to highlight the difficulty of the public sector providing rapid responses to the country's infrastructure needs. The latest report on the PAC 2 accelerated growth programme shows that just 47 of the 229 projects with federal investment have some work in progress, with only seven of the projects having been inaugurated, with the rest still in tender phases or having feas
  • Predicting a big increase in asphalt production
    July 4, 2012
    With new roads to be built and existing ones to be maintained, one company is predicting a big increase in asphalt production Asphalt plant manufacturer Ammann says that four factors in particular will shape the future of the asphalt industry. The company, which has sold its first JustBlack asphalt mixing plant to Costa Rica through its Spanish distribution partner, EMSA, says that many more roads have yet to be built in the world. "Building the global road network will provide work for many generations to