Skip to main content

MOBA technology used on key Russian highway

The Kaliningrad motorway Primorsk Ring is one of the prestige projects under construction within the scope of infrastructure improvements in the Russian exclave. With a total length of around 180kms, of which 81kms are motorway, the ring road will encircle the 500,000 residents of Kaliningrad city in a broad arc around the Samland peninsula. Completion of the US$32.55 million (1bn RUB) project is scheduled for 2015 and should allow comfortable travel for residents, tourists and football fans travelling to t
May 30, 2013 Read time: 3 mins
MCA-2000 from MOBA
The Kaliningrad motorway Primorsk Ring is one of the prestige projects under construction within the scope of infrastructure improvements in the Russian exclave. With a total length of around 180kms, of which 81kms are motorway, the ring road will encircle the 500,000 residents of Kaliningrad city in a broad arc around the Samland peninsula.

Completion of the US$32.55 million (1bn RUB) project is scheduled for 2015 and should allow comfortable travel for residents, tourists and football fans travelling to the 2018 1556 World Cup football venue in Kaliningrad. Four sections have already been opened to traffic; a fifth section is currently under construction. For ZAO VAD, the construction consortium which is performing the work, precise and error-free construction of the road has been a top priority.

To accomplish this, the right material composition, material temperature, smooth paving process and then a precise compaction of the asphalt are necessary.  

"During road construction, it is very important that work be performed exactly and painstakingly from the first to the last work step. Compaction of the paved material is one aspect that plays a key part for a successful result", said Ronald Brinks of ZAO VAD. For this purpose, ZAO VAD, in cooperation with OOO SMD Balt Avtomatika, installed the 1228 MOBA Compaction Assistant system (MCA-2000) on a roller. MOBA technology used on key Russian highway

"The requirement in this project was to make the compaction more controllable as, in the past, this was based solely on the experience of the worker and there was no continuous monitoring of the results. Moreover, it was to be possible to create a quality certificate for the performed compaction work. That is why we decided to use the MCA-2000", said Yuri Dolgilevitch from OOO SMD Balt Avtomatika.
With the MCA-2000, the material is now said to be able to be compacted in a more controlled manner and much more precisely. The system uses temperature sensors to measure the temperature of the paved asphalt. This information appears directly on the display and the roller operator can use it to compact in precisely those areas where the temperature is in the optimum temperature range from 100°C to 140°C. "During comparison measurements, the temperature displayed by the system was identical to the temperature that we measured and thereby facilitates a reliable temperature measurement", said Yuri Dolgilevitch.

This prevents asphalt that is either too cold or too hot from being compacted, which can lead to material damages and, thus, to a reduced road quality.

The system also records the passes of the roller by means of GPS positioning and compares the target and actual passes. The current status is visualised in real time on the seven-inch, touch-screen display: using a colour scheme, the roller operator can identify where a sufficient amount of compaction has been performed and what sections still require passes.

"In addition to supporting the operator, it is important for us that this data still be available afterwards. Because only in this way can we document the quality", said Brinks. This is made possible by the ability of the MCA-2000 to record and store all data such as passes and temperature. The data is compiled for the report and read out using a USB stick and is then available for future use and documentation. By exactly monitoring the compaction processes, unnecessary passes are avoided. This is said by MOBA to reduce MCA-2000 installed machine fuel use by around 20%, while also increasing machine efficiency.

For more information on companies in this article

Related Content

  • Seal of approval
    August 2, 2012
    Timely maintenance using proven cost-effective methods can extend the life of a highway by many years as Patrick smith reports Highways are expensive assets to construct, and the wear and tear of modern traffic means that regular maintenance will delay costly repairs or in extreme cases reconstruction. There are a number of methods of carrying out such maintenance, and these include the use of slurry seals and micro-surfacing, which are cold mixed asphalt which is a mixture of graded aggregate, asphalt emul
  • Key developments are changing the face of the machine control market
    April 4, 2013
    Various business moves are changing the face of the machine control sector - Mike Woof reports An array of developments, both business moves and new technologies, are changing the focus for the machine control segment of the construction equipment sector. For a long time three firms, Leica Geosystems, Trimble and Topcon, have dominated this segment. The three are retaining their strong positions in the market but are seeing additional competition from Hemisphere and MOBA. Arguably the biggest news is that T
  • Aggregate Industries launches Automated Inspection and Testing
    May 15, 2018
    With safety the priority in road paving, Aggregate Industries says it has launched an automated data gathering system to replace hazardous inspections by crew members. AI says that the new system, known as Automated Inspection and Testing, will see all pavers, rollers and survey vehicles fitted with the latest technology including GPS, infra-red sensors and a data recording unit. All will automatically log high-quality data before, during and after the surfacing process.
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.