The 8.5km expressway, in which Cowi was owners engineer for the client Metro Pacific Tollways, incorporates the longest and tallest bridge in the Philippines.
The generator, a GEH2 electro-hydrogen unit made in France by French companies Eneria and EODev (Energy Observer Developments), was set up in Costain’s compound along the M55 motorway in England to power the compound’s services.
At Traffex in Coventry, UK, in May, Elliot Shaw, the English highway agency’s strategy officer, will be the opening day keynote speaker while Mike Guerin, head of business development for SWARCO UK and Ireland, will later present about connected transportation.