Skip to main content

LiuGong is committed to alternative power

LiuGong chairman Zeng Guang’an spoke to David Arminas
By David Arminas July 3, 2025 Read time: 2 mins

LiuGong’s commitment towards the future of battery-electric vehicles in the construction sector is exemplified by its expanded portfolio, including the new 4280DE motor grader.

The battery-electric grader’s battery pack provides fast charging within 1.6 hours and allows normal working conditions between six to 10 hours.

Meanwhile, the large capacity lithium-iron phosphate battery is safe and durable. Its development also demonstrates how new technologies and imagination go hand in hand in today’s R&D, as explained by the company’s chairman, Zeng Guang’an.

Zeng joined LiuGong when he was a 20-year-old university graduate and now has 40 years with the company. During an interview with Global Highways, he noted that innovation requires a great deal of imagination when it comes to technical development because of the incredible tools that are now available, including artificial intelligence.

For example, when the Chinese government took concrete steps to support electric-vehicle development back in 2014, he understood that this could also be done for LiuGong’s machinery.

“You need imagination, dedication but also you need to invest in your ideas. This is most important for the long-term success of new technologies,” he said.

Unlike 20 years ago, digitalisation is increasingly part of the solution for maintaining good dealership relations that includes fast product and service delivery for the end user of LiuGong’s equipment.

“It is easier now to get information from customers thanks to sensors on a machine that tell of its performance in real time,” said Zeng. “We can respond quickly and pinpoint problems for the end user. This speeds up servicing for machines and can improve delivery of parts, too.”

The end user and dealers are always in the forefront of the minds of employees in LiuGong’s global regional hubs. In today’s business environment, increased speed of servicing and parts delivery are part of the many challenges for Liugong’s global dealership network.

“For example, in Europe there are the European Union regulations governing BEVs [battery-electric vehicles] and we have to train our dealers, service dealers and customers to be up to date with the regulations,” he said. “We must invest in this.”

Today’s business environment also now includes the recent global tariff hikes and concerns by almost all sectors of the impact this will have on international supply chains. Nonetheless, Zeng is optimistic about the future of global trade. He is also adamant that LiuGong, which has had customers in the US for more than 50 years, will stay in the US to support them, no matter what. 
 

For more information on companies in this article

Related Content

  • Efficient asset management to trim maintenance budgets
    January 22, 2014
    Transport infrastructure is taken for granted in many, if not most, developed countries. This has resulted in a shortage of investment in maintenance, posing potential long term cost issues. In many developing nations transport networks are expanding fast, but insufficient thought is also being given to how these will be maintained.
  • Brisbane’s Airport: Innovative Management of One of the World’s Busiest Runways
    June 26, 2014
    When it comes to runways, there are few busier then Brisbane’s main runway. Servicing both domestic and international travel, with over 200,000 movements per year, operating without a curfew Brisbane’s main runway is the busiest in Australia. For maintenance, crews only have a limited period of time to determine the pavement condition, normally during the night, making the detection of pavement faults difficult. To resolve this issue, a new high speed pavement scanner was used to rapidly survey the pavem
  • Meet Die Autobahn des Bundes
    November 8, 2021
    Only recently has Germany created a central organisation to maintain and develop the nation’s 13,200km of motorways, called autobahns. Moving from 16 state-run operation centres to one lead centre is a challenge but essential, says Gerd Riegelhuth.
  • The European Road Infrastructure Congress 2016: innovative thinking
    October 18, 2016
    ERIC 2016, the first European Road Infrastructure Congress, has called on the region’s governments to come together and work more imaginatively with the private sector to bring about a safer and more effective highway network. Speaking at the congress’ opening ceremony, FIA president Jean Todt said that if the EU is serious about improving its road safety record, it is essential to develop a high quality highway infrastructure as quickly as possible. Todt (who is also the United Nations special envoy