Skip to main content

Khabarovsk Bypass to raise transit potential of Russian Far East

Khabarovsk Bypass to raise transit potential of Russian Far East – Eugene Gerden writes The Russian Government, together with the government of Khabarovsk Territory, an administrative capital of the Far East, have announced the completion of preparations for the building of a new road. The Khabarovsk Territory is located 30km from the Chinese border, at the confluence of the Amur and Ussuri Rivers. This new highway will boost the transport potential for the Russian Far East and will improve the traffic s
March 13, 2017 Read time: 4 mins
The new Khabarovsk Bypass will improve transport links with the Russian port city of Vladivostok
Khabarovsk Bypass to raise transit potential of Russian Far East – Eugene Gerden writes

The Russian Government, together with the government of Khabarovsk Territory, an administrative capital of the Far East, have announced the completion of preparations for the building of a new road. The Khabarovsk Territory is located 30km from the Chinese border, at the confluence of the Amur and Ussuri Rivers. This new highway will boost the transport potential for the Russian Far East and will improve the traffic situation in the region.

The new road is known as the Khabarovsk Bypass and will connect three existing federal highways in Russia with each other: the A-370 Ussuri; the P-297 Amur; as well as the A-375. According to Vyacheslav Shport, the governor of the Khabarovsk region, building of the new road will be the first transport project in the region, which will be implemented on the basis of public-private partnership.

Under the terms of the project, the length of the new road, which will have four lanes in all, with two in each direction, will be about 27km. It will be 15m wide, and will be designed for the maximum permissible speed of 120km/h. The new road will have traffic capacity of 96,000 cars/day.

The route will pass through five road junctions, 24 bridges and overpasses. It will have five charging points of the stop-and-go type. The project will be implemented by LLC Regional Concession Company, a local firm, which was recently named as the winner of the tender and signed a 15-year concession agreement to build the road with the government of the Khabarovsk Territory on December 12th 2016.

The value of the contract is estimated at around US$900 million (RUB 50 billion). There were 40 bidders for the contract, many of which were from outside Russia.

Construction work is scheduled to commence in the 2nd quarter of 2017 and the new road is expected to be officially commissioned at the beginning of 2020. The proposal to build the new road was first put forward in 2010 after the official launch of the Amur highway, a federal road that forms part of the Trans-Siberian Highway.

With a length of 2,100km this is the longest segment, from Chita to Khabarovsk, connecting the paved roads of Siberia with those of the Russian Far East. The construction of Amur united the Russian federal highways into a single system, stretching from Saint Petersburg to Vladivostok. Building the Amur road meant that Khabarovsk became a link connecting Russia’s two federal highways, and in particular Chita - Khabarovsk and Khabarovsk - Vladivostok. This has resulted in the influx of transit vehicles and cargo flows into the city, which significantly complicated the transport situation within its territory, which doubled the congestion on the local road network.

According to Vladimir Bychenko, chief adviser of the governor of Khabarovsk Territory, about $360 million (RUB 20 billion) will be allocated from the federal budget, another $198 million (RUB 11 billion) - from the regional, while the remainder will be provided by the investor.

Part of the funds for the implementation of the project will be allocated from the investment fund, which is accumulated by the Platon system, a new truck tax system, introduced in Russia in November 2015. The new system was intended to compensate for the damage done to roads by heavy vehicles and requires drivers of trucks weighing over 12tonnes to pay $0.02/km (1.53 rubles/km) when they travel on federal roads.

The toll road will cost $1.98/car (112 rubles) and the new road will allow drivers to save an hour of journey time. According to Nicholas Brusnikin, deputy chairman of the government of the Khabarovsk Krai, building the new road will bring huge benefits not only for the Khabarovsk city, but for the entire Far East region.

Brusnikin has also said that the new road will increase the transit potential of the Far East and will synchronise the ever growing congestion on Russia’s Far East ports and railways. In addition, it will create conditions for the development of intermodal transportation in the region by air, rail and road transport.

And according to Bychenkov, building the new road is justified by the fact that the current volume of transport from the European part of Russia to the marine terminals of Vladivostok exceeds the current transport capacities of road transport by 32%. By 2030, cargo traffic in this direction will increase by a factor of 1.5, compared to the current figures.

The technical and feasibility study of the project was completed by Stroiproeckt, one of Russia's leading design firms.

Related Content

  • Russian road-building industry on verge of massive cuts
    June 10, 2015
    Russia’s road building programme looks set to be cut due to economic issues - Eugene Gerden writes The Russian Government is considering a significant cut to the existing road building programme for the current year. This is due to a current economic crisis in the country, caused by Western sanctions as well as a collapse in the price of oil and gas.
  • New Central Ring Road around Moscow to be built by 2018
    September 30, 2013
    Eugene Gerden evaluates Moscow’s new ring road mega project The Russian government plans to complete implementation of one of the most ambitious projects in the country’s road building industry in recent years, which involves construction of The Central Ring Road around Moscow by 2018. The new road should be built by the next presidential elections, while its length will be 339km. It is expected to be comprised of five sections and will be located 50km away from Moscow Ring Road, a ring road encircling the
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill
  • Russia’s most expensive road project to commence
    January 15, 2019
    Construction work is being planned for Russia’s most expensive road, which will be built in south of the country – Eugene Gerden reports Work is due to commence shortly on Russia’s most expensive road, in the south of the country. The highway will form part of the existing 1,600km Moscow-Sochi road, according to recent statements from senior officials at the Russian Ministry of Transport as well as local analysts. As part of the project, the Russian Government, together with private investors, plans to