Skip to main content

IRF Washington advocates for PPPs in traffic enforcement to boost safety

New IRF Policy Paper outlines effective automated traffic enforcement PPP models. In most countries traffic enforcement cameras and other equipment are purchased, owned, and operated by government organisations. The past two decades have seen a wide-ranging wave of privatisations and introduction of public private partnerships (PPP) in formerly government-owned or controlled activities, including traffic enforcement. Implementing this concept requires a set of principles and good practices presented in
November 10, 2015 Read time: 2 mins
New IRF Policy Paper outlines effective automated traffic enforcement PPP models

In most countries traffic enforcement cameras and other equipment are purchased, owned, and operated by government organisations. The past two decades have seen a wide-ranging wave of privatisations and introduction of public private partnerships (PPP) in formerly government-owned or controlled activities, including traffic enforcement. Implementing this concept requires a set of principles and good practices presented in this IRF policy statement.

In a policy statement released by the IRF and available at 3918 IRF Washington website, good practice guidelines are shared for effective automated traffic enforcement PPP models around the world. These models require at a minimum a private party willing to supply the cameras at no upfront charge to the public party, which could be a municipality, county, state, or nation, and provide a service to issue tickets and collect fines. In these schemes, the private party agrees to recover its investment over time by receiving a negotiated percentage of the fines revenue with a “capped” or maximum monthly or annual payment to the private party established between the public and private party. This cap should not prevent the private party from issuing tickets after this cap is reached, which means a reasonable per ticket fee only to cover the private party’s additional costs should continue after reaching this cap.

Moreover, an independent third party must be hired to approve, routinely inspect, verify and calibrate each camera and the processes to confirm the intended performances.

Lastly, public acceptance of PPP schemes can be strengthened through campaigns pledging that, once the cost thresholds for all the private parties (camera supplier & operator, third party auditors, etc.) are met, revenues generated from the collection of fines are reinvested in road safety related projects.

For more information on companies in this article

Related Content

  • A vision of roads
    September 3, 2012
    By 2040 European roads could be built differently, and hopefully be safer, according to the EU research programme NR2C
  • XCMG hosts Chinese premier Xi Jinping
    May 11, 2018
    XCMG recently hosted Chinese president Xi Jinping. During his annual national inspections following the 19th CPC National Congress, President Xi started his tour by reviewing operations at the XCMG headquarters During this particular stop, President Xi voiced his support for XCMG’s independent research and innovation, and the ways the company has strengthened the development of the economy and the manufacturing industry.
  • The importance of road maintenance
    July 15, 2015
    Gülay Malkoc discusses the importance of investing in road maintenance.
  • Bridges & Road Engineering and Maintenance UAE returns to Abu Dhabi
    March 31, 2016
    IRF Geneva is pleased to support this year the Bridges & Road Engineering and Maintenance UAE conference which will take place – for the third year running - in Abu Dhabi on 22nd-25th May 2016 The UAE has envisioned a new way of developing and carrying out infrastructure. They have shifted their focus on foresight to ensure a socially, economically and environmentally sustainable urban structure, which will enable them to achieve a successful urban revolution by 2030. To achieve this it is vital that