Skip to main content

IRF Washington advocates for PPPs in traffic enforcement to boost safety

New IRF Policy Paper outlines effective automated traffic enforcement PPP models. In most countries traffic enforcement cameras and other equipment are purchased, owned, and operated by government organisations. The past two decades have seen a wide-ranging wave of privatisations and introduction of public private partnerships (PPP) in formerly government-owned or controlled activities, including traffic enforcement. Implementing this concept requires a set of principles and good practices presented in
November 10, 2015 Read time: 2 mins
New IRF Policy Paper outlines effective automated traffic enforcement PPP models

In most countries traffic enforcement cameras and other equipment are purchased, owned, and operated by government organisations. The past two decades have seen a wide-ranging wave of privatisations and introduction of public private partnerships (PPP) in formerly government-owned or controlled activities, including traffic enforcement. Implementing this concept requires a set of principles and good practices presented in this IRF policy statement.

In a policy statement released by the IRF and available at 3918 IRF Washington website, good practice guidelines are shared for effective automated traffic enforcement PPP models around the world. These models require at a minimum a private party willing to supply the cameras at no upfront charge to the public party, which could be a municipality, county, state, or nation, and provide a service to issue tickets and collect fines. In these schemes, the private party agrees to recover its investment over time by receiving a negotiated percentage of the fines revenue with a “capped” or maximum monthly or annual payment to the private party established between the public and private party. This cap should not prevent the private party from issuing tickets after this cap is reached, which means a reasonable per ticket fee only to cover the private party’s additional costs should continue after reaching this cap.

Moreover, an independent third party must be hired to approve, routinely inspect, verify and calibrate each camera and the processes to confirm the intended performances.

Lastly, public acceptance of PPP schemes can be strengthened through campaigns pledging that, once the cost thresholds for all the private parties (camera supplier & operator, third party auditors, etc.) are met, revenues generated from the collection of fines are reinvested in road safety related projects.

For more information on companies in this article

Related Content

  • Our connected and automated future to go under the microscope at RA – IRF Sydney Conference
    May 10, 2018
    As industry and governments around the world continue to grapple with the challenges of vehicle automation, experts will gather in Sydney at the end of May to take stock of progress on the global journey to a new era of mobility. The two-day 2018 Roads Australia (RA) – IRF Regional Conference for Asia and Australasia, to be held over May 31st and June 1st, marks only the second time the two organisations have co-hosted an international event ‘down under’. And with RA playing a key role in helping inform t
  • Private sector shows leadership on road safety at UN High-Level Meeting
    September 26, 2022
    The International Road Federation (IRF) convened key industry leaders to discuss “Action for Road Safety: Private Sector Leadership” on the occasion of the UN High-Level Meeting on Global Road Safety hosted in New York on 30th June and 1st July.
  • Minimising the problems of construction disputes
    September 30, 2013
    *Nigel Grout discusses methods for minimising the risk of potential legal issues in construction projects Disputes and the construction industry are synonymous with each other. In a climate of economic downturn, the prevalence of major disputes will continue to be high as parties are unwilling or not able to compromise to reach a settlement. According to the latest ‘Global Construction Disputes’ report by EC Harris, the global average value of a construction dispute in 2012 was nearly US$32 million.
  • ERF calls for roads maintenance funding
    February 19, 2014
    On 27 November, six key stakeholders sounded an alarm bell to Member States urging them to stick to their pledges made at the International Transport Forum meeting in May 2013, where Ministers signed a joint declaration on Sustainable Infrastructure Financing On the occasion of the launch the latest consultation paper on ‘Roads that Cars can Read’, The European Automobile Manufacturers Association (ACEA), the Federation Internationale de l’Automobile (FIA), the International Road Transport Union (IRU), t