Skip to main content

IRF Global Road Achievements award

IRF is now accepting entries for the 2010 edition of its annual awards competition, the Global Road Achievement Awards (GRAA). The deadline for submission of projects is 31 May, 2010. IRF began this prestigious annual programme as a means to publicise the benefits the road industry makes to global economies and the positive impact road development has on societies around the world. Since the launch of the competition in 2000, more than 70 projects from two dozen countries have been recognised for their cont
February 14, 2012 Read time: 2 mins
2462 IRF is now accepting entries for the 2010 edition of its annual awards competition, the Global Road Achievement Awards (GRAA). The deadline for submission of projects is 31 May, 2010.

IRF began this prestigious annual programme as a means to publicise the benefits the road industry makes to global economies and the positive impact road development has on societies around the world.

Since the launch of the competition in 2000, more than 70 projects from two dozen countries have been recognised for their contributions to the advancement of road development worldwide.

The competition is open to all organisations involved in the road industry and there is no limit to the number of entries an organisation may submit. Projects that may have been recognised in other award programmes also qualify, provided they have not been recognised in any previous IRF GRAA competition.

This year, IRF will be accepting awards submissions in the categories of Safety; Design; Research; Innovative Finance; Quality Management; Advocacy & Lobbying; Programme Management; Environmental Mitigation; Maintenance Management; Construction Methodology; Technology, Equipment & Manufacturing, and Traffic Management & Intelligent Transportation Systems.

For inquiries or more information, please email Scott Pearce at %$Linker: Email 0 0 0 oLinkEmail [email protected] Spearce false mailto:[email protected] true false%> or visit %$Linker: External 0 0 0 oLinkExternal www.irfnews.org/awards IRF News false http://www.irfnews.org/awards false false%>

Related Content

  • INTERMAT launch for Ammann’s rubber tyred rollers
    January 6, 2017
    The new hydrostatic rubber-tyred AP 240 H roller from Ammann is said to set new standards when it comes to ease of use and driveability. Automatic speed control and a gentle start/stop function deliver outstanding results every time. Ammann’s Easy Load ballast system allows fast and easy machine weight adjustment, extending from 9,630kg up to 24 tonnes. An automatic tyre inflation system enables the tyre pressure and contact area to be carefully matched to the surface. Options include thermal skirting, a s
  • Master Mix 1000, music to asphalt ears
    January 6, 2017
    INTERMAT sees the world release of the Master Mix 1000 compact mobile asphalt plant by German manufacturer Benninghoven. The Master Mix 1000 is designed with smaller asphalt operations in mind. With the entire asphalt plant constructed on one chassis, customers can expect to be producing asphalt within a day of delivery. “Flexibility and transportability were the key design criteria,” said company spokesman Bernd Benninghoven.
  • INTERMAT launch for Ammann’s rubber tyred rollers
    April 12, 2012
    The new hydrostatic rubber-tyred AP 240 H roller from Ammann is said to set new standards when it comes to ease of use and driveability. Automatic speed control and a gentle start/stop function deliver outstanding results every time. Ammann’s Easy Load ballast system allows fast and easy machine weight adjustment, extending from 9,630kg up to 24 tonnes. An automatic tyre inflation system enables the tyre pressure and contact area to be carefully matched to the surface. Options include thermal skirting, a s
  • Master Mix 1000, music to asphalt ears
    April 17, 2012
    INTERMAT sees the world release of the Master Mix 1000 compact mobile asphalt plant by German manufacturer Benninghoven. The Master Mix 1000 is designed with smaller asphalt operations in mind. With the entire asphalt plant constructed on one chassis, customers can expect to be producing asphalt within a day of delivery. “Flexibility and transportability were the key design criteria,” said company spokesman Bernd Benninghoven.