Skip to main content

IRF Global Road Achievement Awards Laureate – Riyadh people mover

The Saudi Binladin Group (SBG) has always understood the IRF vision of “Better Roads. Better World” not only as a commitment to a most critical mode of transportation but also as part of an efficient and total transportation system and support services. The objective is always Mobility of People, Commodities and Ideas with safety of users and service providers as a high priority. Here, SBG provides complete mobility by combining an automated people mover with roads and pedestrian facilities within the u
May 19, 2016 Read time: 3 mins
The Automated People Mover is the first Light Rail Transit in the Kingdom of Saudi Arabia
RSSThe 2800 Saudi Binladin Group (SBG) has always understood the 3918 IRF Washington vision of “Better Roads. Better World” not only as a commitment to a most critical mode of transportation but also as part of an efficient and total transportation system and support services.

The objective is always Mobility of People, Commodities and Ideas with safety of users and service providers as a high priority. Here, SBG provides complete mobility by combining an automated people mover with roads and pedestrian facilities within the university, and with outside roads and the future Riyadh metro.

The Automated People Mover represents the first Light Rail Transit in the Kingdom of Saudi Arabia. This project is a state-of-the-art complex system made safe and user-friendly. It represents all the good attributes of a perfect mobility system with Safety, Low Life Cycle Cost, Efficiency, Zero-Carbon footprint, and Driverless operation. It was developed by successfully mobilising a world-class specialist work force and procuring advanced specialty hardware, software, and services. The inauguration of this project, completed and delivered on time, by the late King Abdullah confirms the importance of this national landmark.

The Fully Automatic Train Control System operations are accomplished by a combination of elements located on the train, along the wayside (Third Rail), in stations and at remote Central Control facilities. These elements interact to form a command and control system with four major operations: Automatic Train Protection (ATP): to prevent collisions and derailments; Automatic Train Operation (ATO): the automatic control of train movement and stopping at stations; Automatic Train Supervision (ATS): Control of the direction of train movement in relation to the train movement schedule / timetable; and Communication – the interchange of information among elements of the system and the “intelligent” interaction of several subsystems and equipment. The entire system is controlled by a modern High-Tec Operation Control Centre (OCC) which is located in the Depot Area (Maintenance and Storage Facility).

The Automated People Mover operates on an elevated guide-way / viaduct that separates the movement of its cars from vehicular and pedestrian movement on the University Campus, and provides dedicated and separate service. Since its start of service on 1st September 2012 the APM has travelled 2.7 million kilometers and carried 10.9 million passengers without a single accident, injury, or loss of life.

“This IRF Global Road Achievement Award is for the Kingdom of Saudi Arabia and its Ministry of Finance. The Saudi Binladin Group (SBG) is honoured to be a partner in this landmark project,” said Mohammed M Binladin, deputy chairman and general manager for public relations, Saudi Binladin Group.

2016 GRAA Applications due April 16 Apply online and view the 2015 winners at www.IRFnews.org/graa

For more information on companies in this article

Related Content

  • Innovative traffic information technology used in Vancouver
    April 12, 2012
    As the world descended on Vancouver for the 2010 Winter Olympics, visitors were able to travel around the city with confidence and intelligence thanks to a landmark project by IRF Member, Delcan
  • Lindsay and Nexco reflect on the value of IRF’s global industry network
    October 18, 2016
    In 2015, Nexco East introduced a moveable barrier system in Japan, creating safer work zones along the Joban Expressway, north of Tokyo. Two of the main actors behind this project look back at how it came to life and the role of IRF. Masato Matsumoto: I graduated in 2006 from the IRF Fellowship Programme. As a young professional, becoming an IRF Fellow was a life-changing opportunity. It allowed me to meet industry executives from around world and start building a professional network. Armed with this expe
  • The IRF is holding a webinar on crash cushion selection
    June 22, 2012
    A webinar being run by the IRF will help industry professionals achieve proper crash cushion selection based on site-specific seeds and conditions. The webinar is being held on June 27th from 2:00-3:00 pm US-EDT as part of the IRF’s Safer Roads by Design series and is being hosted by industry expert and IRF safety advisor Mike Dreznes. The aim of the webinar is to deliver proper classification of crash cushions, a task critical to ensure the appropriate placement of crash cushions, also known as impact atte
  • Key IRF congress and exhibition in Abu Dhabi
    February 9, 2012
    The 2nd IRF Middle East Regional Congress will be held from 29 November to 1 December at the Abu Dhabi National Exhibition Centre (ADNEC), in the city of Abu Dhabi, United Arab Emirates. This special event is being convened under the Patronage of the Government of the Emirate of Abu Dhabi, including the association of all major agencies involved in roads and ground transportation, led by the Department of Municipal Affairs; Abu Dhabi Municipality; Al Ain Municipality; Western Municipality, and Abu Dhabi