Skip to main content

IRF Global Road Achievement Awards (GRAA) Winning Project: Morava Corridor Motorway

By IRF Global April 29, 2025 Read time: 3 mins
Bechtel and ENKA have worked together successfully on several construction projects

 

Bechtel and ENKA each boast rich histories, and together, possess nearly 200 years of combined experience—an impressive feat in today’s competitive landscape. For 35 years, the joint venture has tackled some of the industry’s most challenging motorway projects. The Morava Corridor Motorway Project’s program management exemplifies a commitment to excellence, representing a complex endeavor that few can undertake.  

The Morava Corridor Motorway Project is a 112km dual carriageway designed for speeds up to 130km/h, connecting Pojate and the A1 through Kruševac to Preljina, north of Čačak. Running along the West Morava River valley, it links central Serbia with Pan-European Corridors 10 and 11, facilitating connections to Bosnia, Montenegro, and North Macedonia. By improving the flow of goods and people, it will enhance safety, reduce transportation costs, shorten travel times, boost trade, attract investment, and stimulate economic growth, making it a key driver of regional prosperity.  

The project management team has extensive expertise in environment, safety and health (ES&H), engineering, construction, quality assurance and control, procurement, project controls, finance, human resources, public relations, community relations, and sustainability. The team is dedicated to delivering this vital project of national importance for the Serbian Government. 

The 112km motorway is elevated to 4.3m in most sections to prevent flooding. The project encompasses 3,647,448m³ of excavation for motorway works, 12,017,032m³ for river regulation, and 36,875,058m³ from borrow pits. It includes 20,975,470m³ of gravel fill, 1,835,026.92m³ of subgrade, and 1,240,261.77 m³ of subbase material. The partners will lay 1.23 million tonnes of asphalt, construct 37 overpasses, build 78 bridges, and install 236 km of drainage systems with 202 oil separators.   

Final touches include 478 km of guardrails, 230km of wire fencing, 150,000m² of road markings, and 2,400 traffic signs to ensure safety and efficiency. The motorway boosts Serbia's appeal to investors by integrating smart features and a 5G digital corridor for enhanced communication and operational efficiency. Situated on the Morava River's floodplain, it utilises innovative hydro-technical solutions to manage water flow and reduce flood risks in surrounding areas.  
At Bechtel-ENKA, sustainability drives operations on the Morava Corridor Motorway, and the fleet’s efficiency reflects this commitment to reducing the climate footprint. By strategically locating borrow pits and waste areas close to sites, the partners cut operational cost, minimised equipment travel, and reduced fuel use and greenhouse gas emissions, contributing to climate change mitigation.  

From 2020 to 2024, the partners employed 11,324 individuals from 32 nationalities. The current workforce exceeds 4,000 employees, comprising 48% Indian nationals, 24% Turkish, and 27% Serbian. To support the diverse workforce, the partners launched a mental health action plan to prioritise well-being and safety. The human resources, ES&H, public relations, and camp management teams collaborate to organise inclusive events that build community, celebrates diversity, and promotes wellness.  

In December 2023, the first three sections of the motorway, totaling 27km, opened to public traffic ahead of schedule and the partners are on track to deliver the next 30km to the customer by year-end.

For more information on companies in this article

Related Content

  • Kosovo highway wins environmental award
    April 25, 2012
    Bechtel-Enka's Kosovo highway project has won the top prize in the Bechtel's own 2011 Green Footprint Awards for environmental achievements. The Bechtel-Enka joint venture project team was praised by judges for the campaign to reduce, reuse and recycle waste, which was unprecedented in the local area.
  • Progress is being made with Serbia’s Corridor 11 highway project
    October 8, 2012
    Work is underway in Serbia for the Corridor 11 highway project and a number of local firms are now carrying out construction work on the Corridor 11 section from Ub to Lajkovac. Meanwhile Azvirt from Azerbaijan is preparing the Ljig to Preljina stretch of the highway, with the €300 million work being financed by Azerbaijan. The Serbian Government is asking China’s Exim Bank for a long term loan of €850 million, of which €300 million would be for the Corridor 11 project and €550 million would be for the Mora
  • Plans for Serbia-Kosovo highway
    March 10, 2016
    Plans are moving forward for a new highway that will link Kosovo’s capital Pristina with Belgrade, the capital of neighbouring Serbia. The project is of importance as it reveals the continued improvement in diplomatic relations between Serbia and Kosovo. Serbia’s Ministry of Construction says that work on the route will commence in the first half 2017. The financing model for the project has yet to be established. Talks are being held with European partners. The cost of the project has not yet been revealed
  • Serbia speeding spending on roads
    May 21, 2014
    Serbia is planning to speed construction of its highway network. A key project being prioritised is the Corridor 10 motorway, which is due for completion by September 2016. Another priority project is for Corridor 11 and for several regional road routes. At present the Corridor 10 sections between Sid and Belgrade, and Subotica and Belgrade have been built, while work on the 22km Ipsilon stretch between Subotica and Kelebija is underway. Work is also underway on the 96km south node from Grabovnica to Presev