Skip to main content

High fatality rates around the world

In 2010, global road traffic injuries resulted in 1.3 million deaths and were the eighth leading cause of death, with 90% of fatal injuries taking place in low- and middle-income countries At the root of this crisis in the developing world are persisting managerial and technical capacity weaknesses. For many fast-motorising countries, fragmented legislation, poorly targeted funding, ineffective institutional leadership, and outdated road engineering practices could all translate into failure to meet road
March 13, 2014 Read time: 2 mins
Abu Dhabi Road Safety Forum, May 11-13, 2014, additional training on May 14-15
In 2010, global road traffic injuries resulted in 1.3 million deaths and were the eighth leading cause of death, with 90% of fatal injuries taking place in low- and middle-income countries

At the root of this crisis in the developing world are persisting managerial and technical capacity weaknesses. For many fast-motorising countries, fragmented legislation, poorly targeted funding, ineffective institutional leadership, and outdated road engineering practices could all translate into failure to meet road safety targets under the UN Decade of Action.

Taking the measure of the problem, the 2462 IRF is working with 2508 Abu Dhabi Municipality to launch a large-scale road safety forum and capacity-building program on May 11-13, 2014 focusing international attention on the drivers of effective road safety interventions.

Policy roundtables will endeavour to identify the causes and solutions to the “capacity gap” between high performing countries and those countries where serious and fatal injuries are on the rise. Additional panels will address risk factors specific to the context of the Middle East & North Africa region.

An associated Innovation Forum will present high-impact demonstrations set up in partnership with supporting organisations and corporate partners. “The Abu Dhabi Road Safety Forum is one of the most comprehensive efforts to date to address the root causes behind lack of measurable progress across many of the countries we work with,” noted IRF president and CEO C Patrick Sankey. “We salute Abu Dhabi’s leadership in this key area, and are proud to support this initiative.”


Now accepting 2014 GRAA applications!

The Global Road Achievement Awards (GRAA) is a one-of-a-kind competition to recognise innovative road projects and exemplary people that place the road industry at the forefront of worldwide social and economic development.

Entries should be submitted by June 30, 2014. More information at %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.irfnews.org/graa Visit: www.irfnews.org/graa false http://www.irfnews.org/graa false false%>









For more information on companies in this article

Related Content

  • CDE introduces latest M2500 mobile wash plant
    January 6, 2017
    Materials washing specialists CDE’s latest M2500 mobile washing plant and AggMax portable logwasher is being introduced. The M2500, launched to the global market at Bauma 2010, has since been installed in 20 countries throughout Europe, Middle East, Africa, Australasia and Latin America. With existing applications across a wide range of materials including sand and gravel, crushed rock, scalpings, construction and demolition waste recycling, silica sands and iron ore processing the company has announced a n
  • Simem brings concrete batching plant to bauma
    January 6, 2017
    Focal point of Simem’s stand at bauma was an example of its Eagle portable concrete batching plant, which is said to offer top performance at lower cost without compromising the firm’s emphasis on quality. Modular elements with pre-installed pneumatic-electric systems are the key to enabling swift transfer of the Eagle plant from one project to the other. The ‘super-mobile’ MMX range of plant from Simem – said to be the best solution available for faster moving sites such as railways and highways – was also
  • Simem brings concrete batching plant to bauma
    April 22, 2013
    Focal point of Simem’s stand at bauma was an example of its Eagle portable concrete batching plant, which is said to offer top performance at lower cost without compromising the firm’s emphasis on quality. Modular elements with pre-installed pneumatic-electric systems are the key to enabling swift transfer of the Eagle plant from one project to the other. The ‘super-mobile’ MMX range of plant from Simem – said to be the best solution available for faster moving sites such as railways and highways – was also
  • Atlas Copco’s new Boomer E- series
    January 6, 2017
    Atlas Copco says its new Boomer E-series underground mining and tunnelling rigs, available via Atlas Copco’s own worldwide sales organisation from 2013, offers the next generation of rig control system with an improved user interface, including a new intuitive touch-screen, and user-friendly design. “With these improvements, we are confident that the new Boomer series offers one of the most powerful and productive underground mining rigs and tunnelling rigs on the market,” says, Johan Jonsson, product manag