Skip to main content

GRAA focuses on winning project profile: Brisbane Airport Link, Northern Busway & Airport

The revolutionary AUD$4.8 billion Airport Link has delivered a landmark infrastructure project for Australia, tackling traffic congestion, enhancing the busway network and removing an infamous traffic bottleneck through an innovative and inspired design. The Airport Link in Brisbane, Australia included three separate projects – the Northern Busway (a 3km two-way dedicated busway), the Airport Roundabout Upgrade and the AirportlinkM7 (a 6.7km toll road including 5.2km of tunnel). Together, they represent the
May 19, 2014 Read time: 2 mins
Parsons Brinckerhoff and Arup joint venture won the 2013 GRAA for Design
RSSThe revolutionary AUD$4.8 billion Airport Link has delivered a landmark infrastructure project for Australia, tackling traffic congestion, enhancing the busway network and removing an infamous traffic bottleneck through an innovative and inspired design.

The Airport Link in Brisbane, Australia included three separate projects – the Northern Busway (a 3km two-way dedicated busway), the Airport Roundabout Upgrade and the AirportlinkM7 (a 6.7km toll road including 5.2km of tunnel). Together, they represent the largest single investment in transport infrastructure ever undertaken in Australia. The project was delivered by the 2642 Thiess 4755 John Holland (TJH) joint venture with 2693 Parsons Brinckerhoff and 1419 Arup joint venture as the lead design partner, for the Queensland Government-appointed 2641 BrisConnections.

Parsons Brinckerhoff and Arup joined forces – as PBA – to provide technical input into the tender and to deliver the detailed design and construction phase services support. PBA engaged more than 1,000 staff, who worked more than one million hours from start-up in 2006 through to completion in July 2012. During that time PBA delivered more than 18,000 ‘for construction’ drawings in 600 packages with a Total of 3,600 submission cycles.

Aside from 15km of tunnel, the scheme boasts 25 bridges, 15 cut and cover structures, 8.5km of roadway, bicycle paths, 3.5ha of new parklands, more than one million new plants, three ventilation stations, and an operations control building.

The scale and complexity of the project, along with very tight constraints imposed by a highly-populated environment and the need to keep roads open, presented a formidable design challenge. These challenges required a range of technical innovations including underground road interchanges in caverns, the largest of which was 28m wide, and an innovative multilevel flyover with a fast-diamond interchange.

PBA’s scope of works included tunnel, road, geotechnical, electrical and mechanical, fire and life safety, structural and civil works design, as well as coordinating the urban design via subcontracted resources.

2014 GRAA Applications
The Global Road Achievement Awards (GRAA) is a one-of-a-kind competition to recognise innovative road projects and exemplary people that place the road industry at the forefront of worldwide social and economic development.
ENTRIES SHOULD BE SUBMITTED BY JUNE 30, 2014. More information at: www.irfnews.org/graa


For more information on companies in this article

Related Content

  • Developing industry talent through training
    May 19, 2016
    IRF Publishes white paper on talent management solutions On September 15th, 2015, IRF convened a half-day global leadership seminar aimed at examining common talent-related challenges faced by transportation industry actors across the markets where they operate. Strategic approaches to workforce management and talent development are essential to respond effectively to the changing needs of an increasingly diversified transportation industry. A well-educated, multidisciplinary workforce that is capable
  • Innovative sealing of world's longest immersed tunnel
    April 16, 2012
    Infrastructure has been chosen to provide a sealing system for the world's longest immersed tunnel. China Communications Construction is said to have selected Trelleborg for the innovative design of its seals, which are claimed to ensure watertightness even through a seismic event. Part of China's prestigious Hong Kong - Zhuhai - Macau link project, the immersed near 6km tunnel will consist of 32 elements. The joints will be sealed with a Trelleborg sealing system including Gina gaskets, Omega seals and wat
  • Mullum Mullum Valley untouched by progress
    July 20, 2012
    Preserving the unspoiled Mullum Mullum Valley was the major consideration when deciding to build a traffic tunnel The answer to one of the major issues facing construction of the A$2.5 billion EastLink route in Australia was simple: construct a tunnel. While it was expensive, those involved realised they had little option but to go underground to protect the environmentally sensitive Mullum Mullum Valley, an untouched area of wood and bushland in Melbourne. EastLink, the 39km toll road project on the easter
  • Sandvik wins tunneling machine deal in Australia
    July 6, 2015
    Sandvik is supplying a major order of tunnelling machinery for use on a construction project in Australia. This deal is for a major tunnelling project in Sydney. The NSW Government, Transurban and the M7 Westlink Shareholders (the Project Sponsors) are in process to build, operate and maintain a tolled motorway linking the M1 Pacific Motorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. The new route will be called NorthConnex.