Skip to main content

Further bio-binder trials for the UK

Further trials of biogenic binders are being carried out on UK roads.
By MJ Woof October 15, 2024 Read time: 2 mins
The latest trials are on the A2 near the city of Canterbury and A34 near the down of Newbury in England

In England, National Highways has extended trials of biogenic binders to include warm mix asphalt and up to 30% reclaimed asphalt.

Heidelberg Materials and the AtkinsRéalis Jacobs Joint Venture have partnered with National Highways for the trials carried out on the A2 and A34 highways. The companies said that the trial sections will be monitored to review performance and whole-life carbon reduction.

The trials of bio-binders, warm mix asphalt (WMA) and recycled material will help ensure compliance with National Highways’ Works Clause 942 specification for thin surface courses.

Heidelberg Materials has used its CarbonLock asphalt containing polymer modified bitumen (PMB) bio-binders, produced as both hot mix and warm mix asphalts. They contain up to 30% reclaimed asphalt to test the feasibility of various configurations.

Bio-binders contain natural biogenic material, which absorbs and stores CO₂, even when the asphalt is recycled. In addition, the PMB binder used in the trials is expected to boost durability and extend the life of the asphalt, reducing maintenance frequency.

The latest trials are on the A2 near Canterbury and A34 near Newbury. On the A2, four sections were carried out as part of the National Highways – A2 Kingston Scheme. The A2 trials used more than 1,500tonnes – and the A34 around 500tonnes – of CarbonLock asphalt, reducing the carbon emissions associated with the asphalt by around 26%.

The A34 trials, carried out as part of the National Highways A34 SB South Isley to Beedon Scheme, replicated the A2 section works but added a fifth trial section: CarbonLock PMB asphalt containing 30% reclaimed asphalt produced as WMA.

The work was coordinated by the AtkinsRéalis Jacobs joint venture as part of the National Highways research project Future Asphalt Surface Course Linking to NH Net Zero under SPaTS 2. The trial sections are undergoing laboratory testing and are being monitored to see how they compare with standard PMB asphalt used in the control sections in terms of performance and whole-life carbon reduction.

 

For more information on companies in this article

Related Content

  • Bitumen provides more durable road surface
    April 5, 2012
    When the main commuter route into Cardiff, the Welsh capital, began to suffer from acute deformation, the Vale of Glamorgan Council required a durable and faster alternative to hot rolled asphalt to ensure minimum disruption for local road users.
  • Tensar’s Glasstex makes the grade in UK’s Smart Motorway upgrade
    February 27, 2017
    A Stress Absorbing Membrane Interlayer is delivering stronger, safer and more reliable surfaces for the UK’s M3 Smart Motorways project in the southern England.
  • Tarmac tyre trial on UK motorway
    August 7, 2019
    Highways England is carrying out trials of rubberised asphalt on a busy stretch of UK motorway. A section of the M1 near the city of Leicester has been repaved by contractor Tarmac, using a special asphalt mix containing crumb rubber from recycled motor vehicle tyres. Tarmac has developed the mix specially to meet tough requirements from Highways England. This trial will determine how the stretch of highway, located between junction 22 and junction 23, behaves in terms of running wear, skid resistance and
  • Asphalt reinforcement extends road life
    July 12, 2012
    Special reinforcements can extend the life of an old or new road, and also offer environmental benefits. Patrick Smith reports. Asphalt reinforcement can extend the service life of a resurfaced road by a factor of 3-4, says Huesker, developers of the HaTelit range of asphalt reinforcement. Aimed at preventing the propagation of reflective cracking from an old asphalt layer through a new surface course, Huesker claims the formation of reflective cracking is considerably delayed or even completely prevented u