Skip to main content

E&E Event 2018 in Berlin: an asphalt industry fit for purpose

The provisional programme is now available for this year’s Euroasphalt and Eurobitume Event in Berlin. June 14-15. The focus of E&E 2018 will be on the preparations needed by the asphalt industry to ensure that it is fit for purpose in the future. Important strategic issues will be explored, some of which were highlighted in the E&E Congress 2016. These include the increasingly stringent economic aspects of supply and demand, the growing environmental issues over highway construction and use, health
May 15, 2018 Read time: 2 mins
E&E 2018 networking dinner to be held in the 100-year-old architectural delight of Berlin’s Wasserwerk
The provisional programme is now available for this year’s Euroasphalt and Eurobitume Event in Berlin. June 14-15.


The focus of E&E 2018 will be on the preparations needed by the asphalt industry to ensure that it is fit for purpose in the future.

Important strategic issues will be explored, some of which were highlighted in the E&E Congress 2016. These include the increasingly stringent economic aspects of supply and demand, the growing environmental issues over highway construction and use, health and safety within the sector and, as ever, the latest technologies and equipment.

The facilitator will again be Katrina Sichel, back moderating after leading the successful E&E Event 2016. This year’s event will be based on a completely new format. The programme will be centred around a series of professionally-facilitated sessions using debates, workshops and information exchanges, supported by online tools that allow attendees to have their own say.

Attendees will hear about road financing initiatives, the European Union’s Eurovignette Directive as well as ideas on who pays and for what. The latest low-rolling resistance asphalt will be examined, along with more sustainable pavements and how to reduce CO2 emissions along highways.

The venue is Vienna House, Andel’s Berlin and a networking dinner - included in the registration fee - will be amid the historical industrial architecture of the 100-year-old pumping station, Wasserwerk Berlin. More information about Wasserwerk Berlin can be found at the website:
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.wasserwerk-berlin.de false http://www.wasserwerk-berlin.de/ false false%>

For more information to register for the early-bird discount, visit the E&E Event 2018 website: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.eeevent2018.org false http://www.eeevent2018.org/ false false%>

Related Content

  • Wildlife risk to drivers survey being conducted
    June 29, 2016
    A researcher based in Canada is carrying out a research project in the form of a survey assessing the safety risk posed by wildlife to drivers. The risk posed by wildlife to those travelling in vehicles can be severe in some areas and evaluating data can be important for assessing risk levels and awareness of risk levels amongst road users. There is the potential for serious injury or even death in the event of crashes with large animals or at high speeds. Meanwhile a driver avoiding an animal in the roadwa
  • Wirtgen develops novel cutter wear system
    January 6, 2017
    Wirtgen’s novel inspection system offers a quick indication of wear rates on the cutting tools of the firm’s surface miners. Called the Wirtgen Pick Inspection (WPI) system, this tool comprises eight sensors that can make fast measurements and which are integrated into the cutting drum compartment of the surface miner. The sensors measure the degree of wear of the picks and the measuring process takes just one minute to complete, allowing it to carried out while changing trucks and reducing downtimes. The W
  • Wirtgen develops novel cutter wear system
    February 13, 2013
    Wirtgen’s novel inspection system offers a quick indication of wear rates on the cutting tools of the firm’s surface miners. Called the Wirtgen Pick Inspection (WPI) system, this tool comprises eight sensors that can make fast measurements and which are integrated into the cutting drum compartment of the surface miner. The sensors measure the degree of wear of the picks and the measuring process takes just one minute to complete, allowing it to carried out while changing trucks and reducing downtimes. The W
  • Denmark to create Rodby port to service Fehmarn Belt construction
    January 6, 2015
    The Danish government said it will create a large port area east of the small town of Rødbyhavn to facilitate construction of the future Fehmarn Belt tunnel link. The US$7.5 billion project is an 18km tunnel including two railway tunnels, two motorway tunnels and an emergency tunnel. Construction start is scheduled for later this year and should take between six and seven years. The tunnel is part of the major infrastructure project called the Fehmarn Belt Fixed Link to connect the German island of Fe