Skip to main content

Driver feedback signs cut speeding

Technology from 3M is helping reduce the incidence of speeding in the UK city of Salford.
February 15, 2012 Read time: 2 mins
installing the 3M speed indication system should help drivers reduce speed

Technology from 3M is helping reduce the incidence of speeding in the UK city of Salford.

A series of Driver Feedback Signs from 152 3M, DFS 700 units, have been installed in the area to gather both information on average vehicle speeds and encourage drivers to observe the speed limits.

The Urban Vision partnership between Salford City Council and Capita Symonds manages the local highways on behalf of the council and has installed 50 of the DFS 700 units in strategic locations close to schools, the entrances to villages and some major highways. The A6, which is the main route from Salford to Manchester, has six DFS units installed; four of these were funded by the local communities and two by the Safer Routes to School initiative. Most of the DFS installations are permanent with a combination of mains and solar power depending on the location.

Urban Vision says that where monitoring takes place there has been a measurable reduction in speeds, which is consistent with expectations. On one route Urban Vision has recorded a 4.4km/h reduction in mean speeds and average speeds brought down to within the speed limit. Crucially, Urban Vision says it has noted a 64.7% reduction in vehicles exceeding the speed limit since the DFS units were installed. The 3M DFS 700 unit is designed for areas with high pedestrian activity to help encourage drivers to reduce their speeds and can also provide data on driver speed, through a number of different options, including: a USB cable, 2362 Bluetooth or GSM for long distance wireless connections. It can be used for traffic studies and inform decision makers whether extra measures are needed for speed reduction. The sign also benefits from 3M Diamond Grade DG3 reflective sheeting face to boost its visibility in all weathers.

For more information on companies in this article

Related Content

  • Briefly, and to the point
    May 9, 2012
    The low risk found for driving through the tunnel is primarily due to the low volume of traffic of around 11,000 vehicles/day and the ban on HGVs and the transport of hazardous goods. Unidirectional traffic, sufficiently wide lanes, emergency lanes and lighting are the main reasons for the very good result for preventive measures. The tunnel is monitored around-the-clock in a tunnel control centre manned by trained staff, and incidents are automatically reported to the control centre by video link. If neces
  • Construction trends in North America, looking to the future
    June 10, 2019
    Exciting changes in construction will reward the aware contractor - *Jeff Winke comments Hop in a car and drive anywhere in the US and chances are the drive will be on roads and highways that need patching, resurfacing, or widening, and bridges often show signs of needed maintenance. Sadly, things are in bad shape. On the last two report cards from the American Society of Civil Engineers, the US infrastructure scored a D+. This year’s report urges the government and private sector to increase spending
  • Hire Association Europe steals a march
    August 28, 2024
    The association’s new web portal will share equipment theft information with the UK’s National Construction & Agricultural Theft Team (NCATT) and the Construction and Agricultural Equipment Security & Registration Scheme (CESAR).
  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau