Skip to main content

Developing Delhi's local transport systems

Siemens wins BRT order A major contract order was placed with Siemens by DIMTS (Delhi Integrated Multi-Modal Transit System Limited) on behalf of the local Transport Department for the development of the city's Bus Rapid Transit (BRT) system.
February 9, 2012 Read time: 2 mins
A major contract order was placed with 1134 Siemens by DIMTS (2519 Delhi Integrated Multi-Modal Transit System Limited) on behalf of the local Transport Department for the development of the city's Bus Rapid Transit (BRT) system.

The order is for the supply of design services and the installation of a significant range of intelligent traffic signalling equipment including extra low voltage controllers and associated technology for 20 junctions.

Additional equipment and services being supplied includes the provision of a new Central Control Room with Urban Traffic Control (UTC) and SCOOT, over 600 traffic and pedestrian signals, around 350 above-ground detectors, a supply of nearside push-button units for pedestrian crossings and a long-term maintenance contract.

On behalf of the company responsible for placing the contract, AmiChand Srivastava, principal (Transport Planning) for DIMTS, confirmed that Siemens had won the contract order for the first BRT corridor from Ambedkar Nagar to Delhi Gate (length 14.5km.).

"In addition to offering a highly comprehensive and technically robust capability, Siemens provides a reliable range of innovative and sustainable products and services. This gives us great confidence as we develop the next stages of the BRT to meet the increasing needs for mobility with economic growth and for the benefit of the growing volume of people travelling in and around our city," he said.

Delhi is emerging as a hub for all kinds of commercial activities. According to a recent study, it is projected that Delhi and its satellite towns will be among the most densely populated cities in the world by 2020. The transportation network in Delhi is predominantly road based and the number of private vehicles on Delhi's road is increasing at a phenomenal rate.

Around 46% of total personal trips in Delhi were completed by using the public transport system (bus and metro) in 2007-08.

To attract a larger number of bus passengers, the BRT system is designed to play an important role. A reliable and good quality public transportation system offers better mobility, besides other social advantages such as reducing congestion and air pollution. In total, Delhi Government plans to build 26 BRT corridors, covering a total length of 310km by 2020. It has planned to build seven of these in phase one by 2010.

For more information on companies in this article

Related Content

  • Using technology so assess road surface quality
    April 4, 2014
    Advances in survey technology and the evolving face of road procurement are driving demand for highway condition data. Mark Thomas, infrastructure services manager at Fugro Aperio writes how surveys of new roads can improve long-term quality While a growing suite of non-intrusive testing, measurement and survey technologies are widely used to target highway repairs and to determine asset management strategies, the use of these powerful tools remains patchy in the early stages of the infrastructure life cycl
  • A new tunnel project for Turkey is a significant move
    December 12, 2012
    The European Bank for Reconstruction and Development (EBRD) is supplying a finance package worth US$150 million for the new Bosphorus crossing project in Turkey. Running under the Bosphorus at Istanbul, the new tunnel will connect both European and Asian sides of the city. The EBRD’s $150 million loan completes $1.4 billion worth of financing required for the Eurasia Tunnel project, being built under the Bosphorus straits. Other components of the $1.4 billion financing package for this PPP project include a
  • Swiss roundabout goes underground
    February 7, 2012
    The Swiss, well-known for their tunnel constructions, have enhanced their reputation with the recent Gotthard Tunnel breakthrough which has created the world's longest tunnel. And in Bern, a roundabout is being re-positioned almost 10m under the ground, which will transform a somewhat dismal road intersection into an attractive gateway to the country's capital. PERI provided a comprehensive formwork solution for the realisation of the massive beams, reinforced concrete slab along with the conically-sh
  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T