Skip to main content

Developing Delhi's local transport systems

Siemens wins BRT order A major contract order was placed with Siemens by DIMTS (Delhi Integrated Multi-Modal Transit System Limited) on behalf of the local Transport Department for the development of the city's Bus Rapid Transit (BRT) system.
February 9, 2012 Read time: 2 mins
A major contract order was placed with 1134 Siemens by DIMTS (2519 Delhi Integrated Multi-Modal Transit System Limited) on behalf of the local Transport Department for the development of the city's Bus Rapid Transit (BRT) system.

The order is for the supply of design services and the installation of a significant range of intelligent traffic signalling equipment including extra low voltage controllers and associated technology for 20 junctions.

Additional equipment and services being supplied includes the provision of a new Central Control Room with Urban Traffic Control (UTC) and SCOOT, over 600 traffic and pedestrian signals, around 350 above-ground detectors, a supply of nearside push-button units for pedestrian crossings and a long-term maintenance contract.

On behalf of the company responsible for placing the contract, AmiChand Srivastava, principal (Transport Planning) for DIMTS, confirmed that Siemens had won the contract order for the first BRT corridor from Ambedkar Nagar to Delhi Gate (length 14.5km.).

"In addition to offering a highly comprehensive and technically robust capability, Siemens provides a reliable range of innovative and sustainable products and services. This gives us great confidence as we develop the next stages of the BRT to meet the increasing needs for mobility with economic growth and for the benefit of the growing volume of people travelling in and around our city," he said.

Delhi is emerging as a hub for all kinds of commercial activities. According to a recent study, it is projected that Delhi and its satellite towns will be among the most densely populated cities in the world by 2020. The transportation network in Delhi is predominantly road based and the number of private vehicles on Delhi's road is increasing at a phenomenal rate.

Around 46% of total personal trips in Delhi were completed by using the public transport system (bus and metro) in 2007-08.

To attract a larger number of bus passengers, the BRT system is designed to play an important role. A reliable and good quality public transportation system offers better mobility, besides other social advantages such as reducing congestion and air pollution. In total, Delhi Government plans to build 26 BRT corridors, covering a total length of 310km by 2020. It has planned to build seven of these in phase one by 2010.

For more information on companies in this article

Related Content

  • Liebherr tower cranes operating at Santiago airport
    January 14, 2019
    the Santiago Nueva Pudahuel International airport development is benefiting from the proximity of Liebherr’s branch location in Chile. At the moment, 18 of the 23 Liebherr tower cranes are in operation on the large-scale construction site. Of the machines in use, three are high-top models and 15 are flat-top types. The airport in Santiago de Chile is expanding its position as a key hub airport for South America. The operators are extending the site to 265,000m² and have commissioned the construction of a
  • Barrier innovation putting traffic safety and flow first
    April 3, 2014
    Cutting-edge barriers offering greater safety at the same time as limiting traffic disruption are proving in demand on busy world highways, as Guy Woodford reports Small footprint; minimum disruption after impact; lower labour costs; all said to be elements contributing to the growing popularity of the Trend terminal from Trinity Highway Products. This family of end terminals offers a range of safe and efficient solutions to barrier ends with quick and easy assembly and installation. Trinity claims th
  • Qatar developing highway expansion plan
    June 16, 2016
    Qatar is setting the wheels in motion for the development of a comprehensive highway network. Engineering firm KBR is working on a three year, US$185 million consultancy contract to manage Qatar’s highway construction and improvement programme. This package is an extension to KBR’s earlier contract, which the firm won in 2010. The new contract was awarded by Qatar’s Public Works Authority (Ashghal) and the highway network plans will form part of the country’s National Vision 2030 strategy. New and improved
  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.