Skip to main content

Crane assembly for Tibet excavator

A tough machine assembly operation at extreme altitude has been carried out by two cranes from XCMG The cranes were used to assist in the assembly of a large excavator needed to assist in production at an extraction operation in Tibet. Located at an altitude of no less than 5,400m on the very remote Mila Mountain, the extraction sites was aiming at upgrading its operations and boosting productivity with the addition of a new 100tonne class excavator. The two cranes, an XCT100 model and a QAY300A machi
February 9, 2017 Read time: 3 mins
A tough machine assembly operation at extreme altitude has been carried out by two cranes from 2490 XCMG

The cranes were used to assist in the assembly of a large excavator needed to assist in production at an extraction operation in Tibet. Located at an altitude of no less than 5,400m on the very remote Mila Mountain, the extraction sites was aiming at upgrading its operations and boosting productivity with the addition of a new 100tonne class excavator.

The two cranes, an XCT100 model and a QAY300A machine, were used to lift the various components of the heavy excavator into position during the assembly of the machine. And the two cranes operated reliably during this work, despite the extreme altitude. Working at such a height above sea level places enormous constraints on both personnel and machines, with a key issue due to the fact that there is just 56% of the oxygen at 5,400m of that at sea level. Low oxygen levels at high altitudes means that personnel have to take great care so as to avoid altitude sickness.

Meanwhile with far lower air pressures, machines have considerably less air for cooling and can easily overheat unless care is taken. The lower oxygen levels meanwhile affect combustion processes in engines, severely reducing power output in many instances unless special turbocharging systems are utilised. Machine users have to run equipment with these factors in mind, reducing load so as to avoid the risk of damage.

Meanwhile just to reach the extraction site, the cranes and the excavator faced a considerable challenge. After the cranes left the XCMG facility in Xuzhou, the machines passed through nine Chinese provinces and across numerous bridges, travelling a distance of over 3,700km in seven days to reach the site, located in Maizhokunggar County on the Tibet Plateau. The mountain roads were not always in optimum conditions, making the journey slow in stretches and placing a heavy responsibility on the drivers, as well as providing challenges to the manoeuvrability of the vehicles around some of the tighter curves.

The long distance route and the high working altitude provided a tough test for the large mobile cranes, making heavy requirements on braking, reliability and work safety. Featuring a quick switch between three-axle drive and four-axle drive, the QAY300A all-terrain crane was able to easily adapt to the difficult working conditions. And despite the low air pressure and temperature in the mountainous terrain, the machines continued to work reliably.

For more information on companies in this article

Related Content

  • Terex's new TA300 articulated truck which joins the company's new product family of ADTs
    February 6, 2012
    Terex has launched its new TA300 articulated truck which joins the company's new product family of ADTs. Terex claims that the TA300, which replaces the TA30 model launched in 2002, is the only hauler in 30tonne market that has fully independent front suspension (IFS) as standard. The model joins the TA350 (previously TA35) and TA400 (TA40), launched in September, 2009. and the TA250 being launched in April.
  • XCMG develops new telehandler and crane
    June 9, 2015
    XCMG is broadening its range of lifting machines with the introduction of a new telehandler and a new crane. The XC6-4517 telehandler has been developed in-house and is now being exported, with units having been supplied to Qatar. Although based on existing models, the new XC6-4517 features better ergonomics and a new FOP and ROPS cab that offers good all-round visibility. High off-road performance is claimed while the machine is also manoeuvrable, with a minimum turning radius of 3.8m. The machine is d
  • Russian firm uses crane to help bridge building
    May 5, 2015
    Russian construction company BaltMostStroy has been using a Sennebogen 7700 crawler crane to build bridges along a new freeway route The 300tonne capacity crawler crane has been used to lift prefabricated parts weighing as much as 100tonnes onto the concrete foundations. LLC Lonmadi in St Petersburg is Sennebogen’s Russian sales and service partner and supplied the contractor with the 7700 crawler crane. This versatile crawler crane is being used on demanding infrastructure construction work in Russia. A
  • Caterpillar meets the challenges
    February 14, 2012
    Roads in south-eastern France and those on the west coast of Spain share a common challenge often faced by road construction crews around Europe: extremely tight working conditions. According to Caterpillar, such conditions create construction demands that can affect traffic flow, the preservation of historic structures and even the ability to resurface these narrow roads that, in some cases, have been around for centuries. Add to these challenging working conditions, the mountainous terrain found in the Al