The theme ‘Together on the road again’ is apt given that the pandemic had “kept us apart for far too long”, notes PIARC, the Permanent International Association of Road Congresses, or World Road Association.
The 8.5km expressway, in which Cowi was owners engineer for the client Metro Pacific Tollways, incorporates the longest and tallest bridge in the Philippines.
The generator, a GEH2 electro-hydrogen unit made in France by French companies Eneria and EODev (Energy Observer Developments), was set up in Costain’s compound along the M55 motorway in England to power the compound’s services.