Skip to main content

Bulgaria: back on track?

Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million). One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect t
July 23, 2012 Read time: 4 mins

The EC is taking a more supportive position, as Bulgaria attempts to put its road building programme back on track, writes Gordon Feller

Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million).

One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect the Sofia ring road to the Hemus Highway, which runs from the capital to Varna, Bulgaria's second largest commercial centre on the Black Sea coast.

Both projects have been held up by funding irregularities, while the Kardzhali-Podkova road was the subject of some controversy as the original concession was allegedly awarded in breach of proper procedure.

Another major project, the Lyulin Motorway, a 19km stretch linking Sofia with the prospective Struma Motorway leading to the south-western border town of Kulata, and then to the Greek city of Thessaloniki, should also receive a boost soon.

The Transport Ministry, the NRIA (until recently the National Road Infrastructure Fund) and the 2465 European Commission (EC) are expected to reach a deal on tenders for technical support for the motorway's construction as we go to press.

This follows the news from July, when it was revealed that the contractor, Turkish firm 4148 Mapa-4144 Cengiz, had only completed 5% of the road, rather than the 40% scheduled for mid-2008. The project had been delayed by labour shortages and difficulties in obtaining visas for Turkish workers, and is now due for completion in May 2010.

Previous EU funding to the Lyulin project through the Instrument for Structural Policies for Pre-Accession (1118 ISPA) programme, which aims to develop transport infrastructure in countries joining the EU, had been suspended over doubts about adherence to procedural rules. Once a new settlement has been reached, the EC will decide whether to continue financing road projects under ISPA, with the announcement expected on 24 November 2008.

The EU had previously agreed to provide $163 million (€119.5 million) of the estimated $217 million (€160 million) cost of the Lyulin Motorway, which is considered vital to easing traffic pressures around Sofia and improving cross-continent transport links.

The Bulgarian capital lies at the confluence of three major pan-European transport corridors, key routes earmarked by European governments for development. These are corridors VIII (which runs from Durres on Albania's Adriatic coast to Varna, including Bulgaria's partially complete Trakia Motorway) and X and IV, from Central Europe to Istanbul and Thessaloniki, respectively.

Despite the expected fillip to Bulgaria's road building programme, the process of upgrading the country's creaking network is likely to be a slow and expensive one. The Struma Motorway, which is also only partially complete, is a crucial section of corridor IV, but is not expected to be finished until 2020. The road's cost has been estimated at $880 million (€645 million), but recent media reports suggest that it could run to $1.45 billion (€1 billion), partly due to additional environmental protection measures.

The government claimed in mid-September that it had made record progress in highway construction, with 100km of motorway and 4,000km of other roads completed in just three years.

Certainly, recent developments indicate that the authorities are pushing forward with road-building schemes despite the EC's suspension of a €519 million block of funding in July, the latest of a series of freezes affecting expenditure on transportation.

The government has allocated €260 million of the budget surplus to an "infrastructure package," which includes the continuation of work on the Trakia Motorway.

Prime Minister Sergei Stanishev has given notice that he is willing to dip further into the budget surplus, which totalled €2.18 billion in the first seven months of the year, in order to keep infrastructure developments on track. n

The government has allocated €260 million of the budget surplus to an "infrastructure package," which includes the continuation of work on the Trakia Motorway

For more information on companies in this article

Related Content

  • Slovenia tunnel contract reselection
    December 6, 2018
    The contract for the second drive for the Karavanke tunnel connecting Slovenia with Austria is now once more being tendered. The project was awarded earlier this year to the Turkish contractor, Cengiz Insaat Sanayi Ve Ticaret. However this deal was then annulled and the firm prevented from reapplying. The Turkish company had submitted a bid of €89.3 million for the work. However this had to be rejected as the actual estimate to build the link sets a pricetag of some €121.5 million. The Slovenian road opera
  • New Bulgaria-Romania Danube crossings
    October 28, 2014
    The Bulgarian and Romanian Governments have agreed over projects to build new bridges crossing the Danube River and linking the country. One of the two bridges will be constructed between Nikopol and Turnu Magurele while the other will connect Silistra and Calarasi. Funding for the projects will be provided by the Cross Border Cooperation Programme Bulgaria-Romania 2014-2020. The work to upgrade to the existing bridge at Ruse-Giurgiu will be included in the EU's operational transport programme for 2014-2020
  • EBRD financing for Albania and Kosovo
    December 16, 2020
    Financing from the EBRD will pay for works in Albania and Kosovo.
  • Cost drop for Albania’s Thumana-Kashar motorway?
    August 15, 2019
    Albania’s Thumana-Kashar section of the A1 motorway may cost 50% less than planned, according to a recent feasibility study.