Skip to main content

ASECAP: Cooperation needed for better toll-road risk management

Toll operators must offer a level of service for which drivers are prepared to pay because in many cases, drivers have alternative free-use routes. Incentives to attract drivers onto toll roads must include shorter and reliable journey times as well smooth and trouble free travel – all at an affordable price. Private companies running toll roads face the same difficulties as any other commercial entity, in particular financing construction before any toll revenue can be collected. Hardly surprising that fin
May 31, 2017 Read time: 3 mins
Guy Chetrit: PPPs may not be the answer
Toll operators must offer a level of service for which drivers are prepared to pay because in many cases, drivers have alternative free-use routes. Incentives to attract drivers onto toll roads must include shorter and reliable journey times as well smooth and trouble free travel – all at an affordable price.

Private companies running toll roads face the same difficulties as any other commercial entity, in particular financing construction before any toll revenue can be collected. Hardly surprising that financing was one of the major themes at a recent Study and Information Days event put on by 1103 ASECAP, the European association of toll concessionaires.

The stakes are high. ASECAP’s members operate more than 50,000km of tolled highways. Across the Atlantic, members of the International Bridge Tunnel and Turnpike Association (2793 IBTTA), ASECAP’s North American equivalent, operate more than 8,500km of highway.

A client’s tender document for a planned toll road includes all the details including the road’s proposed route and design, land surveys and – importantly - estimates of expected traffic volumes. Potential bidders base their calculations upon this data.

However, should there be significant differences between the details provided and reality, the winning bidder can make a claim for changes to the contract – especially in terms of payment. The construction phase represents one of the biggest risks - particularly as the road may not be open and therefore the concessionaire would not be receiving any toll revenue.

The moment the contract is signed, “the partnership ends and the fighting begins. Once the contract is signed it’s a zero-sum game: my gain is your loss,” said José Viegas, secretary general of the 1102 International Transport Forum.

He urged delegates, which included local authorities, concessionaires and contractors, to cooperate and not let lawyers take control.

One of the biggest changes in the tolling industry working its way through the system is European Union Directive 2014/23/EU which redefines the European model of a concession. In the new regulations, the concessionaire must accept the risk of failure. In tolling that often relates to unexpected difficulties during construction of the volume of traffic that use the new road. This introduces a degree of uncertainly which, Guy Chetrit of the 1054 European Investment bank, told the conference, means “PPPs [public-private partnerships] are not the right vehicle for funding toll road construction as a PPP needs certainty.”

For more information on companies in this article

Related Content

  • IRF World Congress: Road user charging
    October 16, 2024
    Where will the money come from to develop and maintain tomorrow’s sustainable road network, no mater in what nation? This was the focus of another session at the IRF World Congress in Istanbul of day of the three-day event.
  • ASECAP Days in Milan fast approaching
    May 3, 2024
    Make a date in the diary for ASECAP DAYS 2024 from May 13-15 in the exciting Italian city of Milan.
  • Transport forum report
    January 24, 2014
    The International Transport Forum (ITF) has published a new report on how better regulated Public-Private Partnerships (PPPs) can improve funding and delivery of transport infrastructure. The ITF highlights how PPPs have become an important tool for governments to attract private finance for infrastructure investments. In the face of tight budgets, PPPs are seen as a means to maintain transport investment and limit public spending at the same time.
  • Kazakhstan’s London road show woos consortia for Almaty ring road
    March 2, 2015
    Kazak and EBRD officials visited London to highlight the possibility of a public-private partnership under the country’s revised PPP legal framework. David Arminas reports. To build a road, you go on the road, and that is what Kazakhstan did in London in mid-December. Representatives of more than 100 organisations, a mix of construction companies and financial institutions, attended the roadshow-style presentation to attract foreign capital for BAKAD, the Almaty Ring Road Concession. The message was that Ka