Skip to main content

ASECAP: Cooperation needed for better toll-road risk management

Toll operators must offer a level of service for which drivers are prepared to pay because in many cases, drivers have alternative free-use routes. Incentives to attract drivers onto toll roads must include shorter and reliable journey times as well smooth and trouble free travel – all at an affordable price. Private companies running toll roads face the same difficulties as any other commercial entity, in particular financing construction before any toll revenue can be collected. Hardly surprising that fin
May 31, 2017 Read time: 3 mins
Guy Chetrit: PPPs may not be the answer
Toll operators must offer a level of service for which drivers are prepared to pay because in many cases, drivers have alternative free-use routes. Incentives to attract drivers onto toll roads must include shorter and reliable journey times as well smooth and trouble free travel – all at an affordable price.


Private companies running toll roads face the same difficulties as any other commercial entity, in particular financing construction before any toll revenue can be collected. Hardly surprising that financing was one of the major themes at a recent Study and Information Days event put on by 1103 ASECAP, the European association of toll concessionaires.

The stakes are high. ASECAP’s members operate more than 50,000km of tolled highways. Across the Atlantic, members of the International Bridge Tunnel and Turnpike Association (2793 IBTTA), ASECAP’s North American equivalent, operate more than 8,500km of highway.

A client’s tender document for a planned toll road includes all the details including the road’s proposed route and design, land surveys and – importantly - estimates of expected traffic volumes. Potential bidders base their calculations upon this data.

However, should there be significant differences between the details provided and reality, the winning bidder can make a claim for changes to the contract – especially in terms of payment. The construction phase represents one of the biggest risks - particularly as the road may not be open and therefore the concessionaire would not be receiving any toll revenue.

The moment the contract is signed, “the partnership ends and the fighting begins. Once the contract is signed it’s a zero-sum game: my gain is your loss,” said José Viegas, secretary general of the 1102 International Transport Forum.

He urged delegates, which included local authorities, concessionaires and contractors, to cooperate and not let lawyers take control.

One of the biggest changes in the tolling industry working its way through the system is European Union Directive 2014/23/EU which redefines the European model of a concession. In the new regulations, the concessionaire must accept the risk of failure. In tolling that often relates to unexpected difficulties during construction of the volume of traffic that use the new road. This introduces a degree of uncertainly which, Guy Chetrit of the 1054 European Investment bank, told the conference, means “PPPs [public-private partnerships] are not the right vehicle for funding toll road construction as a PPP needs certainty.”

For more information on companies in this article

Related Content

  • We need better connected transport, says OECD
    May 4, 2012
    Better connected transport will drive economic growth and better protect the environment, according to the Transport Outlook 2012 report on mobility trends produced by the International Transport Forum at the OECD (Organisation for Economic Co-operation and Development). The new influential report was launched by OECD Secretary-General Angel Gurría during the Annual Summit of Transport Ministers held in Leipzig, Germany. “Transport and technology form the backbone of global trade,” said Gurría at the summ
  • Road charging the way forward for road funding?
    May 23, 2012
    Major changes will be required in the way that highway infrastructure investment is funded in many developed nations. Fuel taxation is a key source of income for governments, with some countries (such as the US) using a set sum for road repairs, maintenance and new construction. Fuel taxation is a proportional way to fund road infrastructure improvements, basically as larger vehicles or those that are used more, will pay more.
  • Call for road builders to consider carbon trading
    July 4, 2012
    Anticipating new trends, the IRF organised a high level panel discussion on the promising and fast-growing market of carbon trading in the margins of the 2nd International Roads and Environment Conference hosted in Geneva, Switzerland on 10-11 November, 2008. Now is the time for the road builders to add trading to their armoury of carbon-reducing measures. Carbon trading has moved from the margins to centre stage. World economic growth may be stalling or going into reverse, but the search for post-Kyoto cl
  • India’s longest tolled expressway is open to traffic
    January 2, 2013
    Earlier this year, a new expressway was opened to traffic in India, adding connectivity to the country’s road network - Mike Woof reports. India’s economic growth has fuelled a massive construction boom in the country. Road building has been set as a priority by the Indian Government to help ensure continued economic development and improve connectivity between major population centres. One major new expressway has recently opened to traffic, having been designed to international standards and provides insi