Skip to main content

ASECAP: Cooperation needed for better toll-road risk management

Toll operators must offer a level of service for which drivers are prepared to pay because in many cases, drivers have alternative free-use routes. Incentives to attract drivers onto toll roads must include shorter and reliable journey times as well smooth and trouble free travel – all at an affordable price. Private companies running toll roads face the same difficulties as any other commercial entity, in particular financing construction before any toll revenue can be collected. Hardly surprising that fin
May 31, 2017 Read time: 3 mins
Guy Chetrit: PPPs may not be the answer
Toll operators must offer a level of service for which drivers are prepared to pay because in many cases, drivers have alternative free-use routes. Incentives to attract drivers onto toll roads must include shorter and reliable journey times as well smooth and trouble free travel – all at an affordable price.


Private companies running toll roads face the same difficulties as any other commercial entity, in particular financing construction before any toll revenue can be collected. Hardly surprising that financing was one of the major themes at a recent Study and Information Days event put on by 1103 ASECAP, the European association of toll concessionaires.

The stakes are high. ASECAP’s members operate more than 50,000km of tolled highways. Across the Atlantic, members of the International Bridge Tunnel and Turnpike Association (2793 IBTTA), ASECAP’s North American equivalent, operate more than 8,500km of highway.

A client’s tender document for a planned toll road includes all the details including the road’s proposed route and design, land surveys and – importantly - estimates of expected traffic volumes. Potential bidders base their calculations upon this data.

However, should there be significant differences between the details provided and reality, the winning bidder can make a claim for changes to the contract – especially in terms of payment. The construction phase represents one of the biggest risks - particularly as the road may not be open and therefore the concessionaire would not be receiving any toll revenue.

The moment the contract is signed, “the partnership ends and the fighting begins. Once the contract is signed it’s a zero-sum game: my gain is your loss,” said José Viegas, secretary general of the 1102 International Transport Forum.

He urged delegates, which included local authorities, concessionaires and contractors, to cooperate and not let lawyers take control.

One of the biggest changes in the tolling industry working its way through the system is European Union Directive 2014/23/EU which redefines the European model of a concession. In the new regulations, the concessionaire must accept the risk of failure. In tolling that often relates to unexpected difficulties during construction of the volume of traffic that use the new road. This introduces a degree of uncertainly which, Guy Chetrit of the 1054 European Investment bank, told the conference, means “PPPs [public-private partnerships] are not the right vehicle for funding toll road construction as a PPP needs certainty.”

For more information on companies in this article

Related Content

  • BAM and Iridium get the green light Ross link road in Ireland
    December 15, 2014
    The BAM PPP PGGM and Iridium consortium has been named preferred bidder for the N25 New Ross Bypass project in the Irish Republic. The US$270 million (€217 million) contract - Design, Build, Finance, Maintain and Operate - involves 13.6 km of dual carriageway on the N25 and N30 routes and 1.2 km of the carriageway New Ross N30 route. Construction is expected to support around 300 jobs across Ireland and will be undertaken by a joint venture of BAM Civil and civil engineering firm Dragados. The road will
  • Innovation is behind all business partnerships
    February 24, 2015
    While reclaimed asphalt pavement is not a new idea, there are new and innovative technologies coming all the time to improve its application and durability. This RAP is “black gold”, as Thierry De Sars, technical director at Groupe Fayat, told delegates at the Pavement Preservation and Recycling Summit conference in Paris this week. But it all comes down to cost savings and efficiencies that importantly include increasingly precise dozing to get the exact amount of bitumen laid down on a pass. De Sars cauti
  • Innovation is behind all business partnerships – with recycled asphalt a key source for revenue
    March 6, 2015
    While reclaimed asphalt pavement is not a new idea, there are new and innovative technologies coming all the time to improve its application and durability.
  • Book now … the early booking deadline for PPRS 2015 in Paris has been extended
    November 13, 2014
    Book now … the first Pavement Preservation &-Recycling (World) Summit (PPRS 2015), due to take place in the Palais des Congrès in Paris from February 22 2015 to February 25 2015, has extended its deadline for early bird registration November 15 2014.