Skip to main content

ASECAP: Cooperation needed for better toll-road risk management

Toll operators must offer a level of service for which drivers are prepared to pay because in many cases, drivers have alternative free-use routes. Incentives to attract drivers onto toll roads must include shorter and reliable journey times as well smooth and trouble free travel – all at an affordable price. Private companies running toll roads face the same difficulties as any other commercial entity, in particular financing construction before any toll revenue can be collected. Hardly surprising that fin
May 31, 2017 Read time: 3 mins
Guy Chetrit: PPPs may not be the answer
Toll operators must offer a level of service for which drivers are prepared to pay because in many cases, drivers have alternative free-use routes. Incentives to attract drivers onto toll roads must include shorter and reliable journey times as well smooth and trouble free travel – all at an affordable price.

Private companies running toll roads face the same difficulties as any other commercial entity, in particular financing construction before any toll revenue can be collected. Hardly surprising that financing was one of the major themes at a recent Study and Information Days event put on by 1103 ASECAP, the European association of toll concessionaires.

The stakes are high. ASECAP’s members operate more than 50,000km of tolled highways. Across the Atlantic, members of the International Bridge Tunnel and Turnpike Association (2793 IBTTA), ASECAP’s North American equivalent, operate more than 8,500km of highway.

A client’s tender document for a planned toll road includes all the details including the road’s proposed route and design, land surveys and – importantly - estimates of expected traffic volumes. Potential bidders base their calculations upon this data.

However, should there be significant differences between the details provided and reality, the winning bidder can make a claim for changes to the contract – especially in terms of payment. The construction phase represents one of the biggest risks - particularly as the road may not be open and therefore the concessionaire would not be receiving any toll revenue.

The moment the contract is signed, “the partnership ends and the fighting begins. Once the contract is signed it’s a zero-sum game: my gain is your loss,” said José Viegas, secretary general of the 1102 International Transport Forum.

He urged delegates, which included local authorities, concessionaires and contractors, to cooperate and not let lawyers take control.

One of the biggest changes in the tolling industry working its way through the system is European Union Directive 2014/23/EU which redefines the European model of a concession. In the new regulations, the concessionaire must accept the risk of failure. In tolling that often relates to unexpected difficulties during construction of the volume of traffic that use the new road. This introduces a degree of uncertainly which, Guy Chetrit of the 1054 European Investment bank, told the conference, means “PPPs [public-private partnerships] are not the right vehicle for funding toll road construction as a PPP needs certainty.”

For more information on companies in this article

Related Content

  • RFQ is out for the Gordie Howe Bridge to link US and Canada
    July 22, 2015
    The bidding process has started for the Gordie Howe International Bridge that will link Detroit in the US state of Michigan and Windsor, in the Canadian province of Ontario. The Windsor-Detroit Bridge Authority (WDBA) has sent out a request for qualifications (RFQ) for the bridge that will likely be either cable stayed or suspension to cross the Detroit River. The bridge also likely will come with a hefty price tag – around US$1.62 billion, as World Highways reported in May in a feature on the proposed b
  • US Senate approves federal highway programme
    June 24, 2014
    In the US, the Senate Environment & Public Works Committee has made a key move by approving a six-year reauthorisation of the federal highway programme. This is a landmark political step and is likely to have been the subject of much cross-party negotiation. The move will be of major importance for the transportation construction industry, which has suffered badly from low levels of business in recent years. This six-year package will provide a major stimulus to business for contractors and equipment firms
  • We're here to help
    July 16, 2012
    Formed at the end of the Cold War, the European Bank for Reconstruction and Development has raised, and loaned, billions to revitalise infrastructure from central Europe to central Asia as Patrick Smith reports One of the highlights of the year for Thomas Maier has been the recent trip to Bratislava, the capital of Slovakia, where history was made. As the Business Group director in charge of the infrastructure sector at the European Bank for Reconstruction and Development (EBRD) he was present when contract
  • Modified asphalt trials in Brazil
    October 17, 2012
    An urgent need to improve and extend its road network means that Brazil is open to innovation and new ideas - the timing looks good for Kraton and its highly modified asphalt. Kristina Smith reports On 15th August Brazilian president Dilma Rousseff announced a US$66 billion (BRL 133 billion) investment package for the country’s road and rail networks. Of that, $21 billion (BRL 42 billion) is earmarked for the upgrade or construction of 7,500km of highways through a series of concessions. “We’re starting an