Skip to main content

ASECAP: Cooperation needed for better toll-road risk management

Toll operators must offer a level of service for which drivers are prepared to pay because in many cases, drivers have alternative free-use routes. Incentives to attract drivers onto toll roads must include shorter and reliable journey times as well smooth and trouble free travel – all at an affordable price. Private companies running toll roads face the same difficulties as any other commercial entity, in particular financing construction before any toll revenue can be collected. Hardly surprising that fin
May 31, 2017 Read time: 3 mins
Guy Chetrit: PPPs may not be the answer
Toll operators must offer a level of service for which drivers are prepared to pay because in many cases, drivers have alternative free-use routes. Incentives to attract drivers onto toll roads must include shorter and reliable journey times as well smooth and trouble free travel – all at an affordable price.

Private companies running toll roads face the same difficulties as any other commercial entity, in particular financing construction before any toll revenue can be collected. Hardly surprising that financing was one of the major themes at a recent Study and Information Days event put on by 1103 ASECAP, the European association of toll concessionaires.

The stakes are high. ASECAP’s members operate more than 50,000km of tolled highways. Across the Atlantic, members of the International Bridge Tunnel and Turnpike Association (2793 IBTTA), ASECAP’s North American equivalent, operate more than 8,500km of highway.

A client’s tender document for a planned toll road includes all the details including the road’s proposed route and design, land surveys and – importantly - estimates of expected traffic volumes. Potential bidders base their calculations upon this data.

However, should there be significant differences between the details provided and reality, the winning bidder can make a claim for changes to the contract – especially in terms of payment. The construction phase represents one of the biggest risks - particularly as the road may not be open and therefore the concessionaire would not be receiving any toll revenue.

The moment the contract is signed, “the partnership ends and the fighting begins. Once the contract is signed it’s a zero-sum game: my gain is your loss,” said José Viegas, secretary general of the 1102 International Transport Forum.

He urged delegates, which included local authorities, concessionaires and contractors, to cooperate and not let lawyers take control.

One of the biggest changes in the tolling industry working its way through the system is European Union Directive 2014/23/EU which redefines the European model of a concession. In the new regulations, the concessionaire must accept the risk of failure. In tolling that often relates to unexpected difficulties during construction of the volume of traffic that use the new road. This introduces a degree of uncertainly which, Guy Chetrit of the 1054 European Investment bank, told the conference, means “PPPs [public-private partnerships] are not the right vehicle for funding toll road construction as a PPP needs certainty.”

For more information on companies in this article

Related Content

  • By invitation: Africa’s road funds are under pressure
    November 8, 2021
    Ali Ipinge is CEO of the Road Fund Administration (RFA) of Namibia and, since early 2021, presides over the 35-member African Roads Maintenance Funds Association (ARMFA). Ahead of the 18th IRF World Meeting & Exhibition which he will be keynoting, Ipinge highlighted developments in the quest for sustainable road maintenance funding in the African continent
  • A new tunnel project for Turkey is a significant move
    December 12, 2012
    The European Bank for Reconstruction and Development (EBRD) is supplying a finance package worth US$150 million for the new Bosphorus crossing project in Turkey. Running under the Bosphorus at Istanbul, the new tunnel will connect both European and Asian sides of the city. The EBRD’s $150 million loan completes $1.4 billion worth of financing required for the Eurasia Tunnel project, being built under the Bosphorus straits. Other components of the $1.4 billion financing package for this PPP project include a
  • IRF Global Road Achievement Awards Laureate city Road Improvement Project
    November 30, 2015
    Thiruvananthapuram, the capital city of Kerala (India) had been witnessing rapid urbanisation. The government of Kerala implemented the Thiruvananthapuram City Road Improvement Project (TRCIP) to widen the existing 42km of existing road network to cater the needs of rapid urbanisation.
  • Growth coming for Asian construction market
    September 4, 2018
    A new report produced by research specialist GlobalData predicts continued growth for Asia’s construction market. According to the report, construction in the ASEAN region will grow by over 6% annually over next five years. The report has been published to coincide with the INTERMAT ASEAN 2018 and Concrete Asia 2018 trade shows for construction, infrastructure and concrete sectors. The data suggests that construction output in the member states of the Association of South-East Asian Nations (ASEAN) would ex