Skip to main content

ASECAP: Cooperation needed for better toll-road risk management

Toll operators must offer a level of service for which drivers are prepared to pay because in many cases, drivers have alternative free-use routes. Incentives to attract drivers onto toll roads must include shorter and reliable journey times as well smooth and trouble free travel – all at an affordable price. Private companies running toll roads face the same difficulties as any other commercial entity, in particular financing construction before any toll revenue can be collected. Hardly surprising that fin
May 31, 2017 Read time: 3 mins
Guy Chetrit: PPPs may not be the answer
Toll operators must offer a level of service for which drivers are prepared to pay because in many cases, drivers have alternative free-use routes. Incentives to attract drivers onto toll roads must include shorter and reliable journey times as well smooth and trouble free travel – all at an affordable price.

Private companies running toll roads face the same difficulties as any other commercial entity, in particular financing construction before any toll revenue can be collected. Hardly surprising that financing was one of the major themes at a recent Study and Information Days event put on by 1103 ASECAP, the European association of toll concessionaires.

The stakes are high. ASECAP’s members operate more than 50,000km of tolled highways. Across the Atlantic, members of the International Bridge Tunnel and Turnpike Association (2793 IBTTA), ASECAP’s North American equivalent, operate more than 8,500km of highway.

A client’s tender document for a planned toll road includes all the details including the road’s proposed route and design, land surveys and – importantly - estimates of expected traffic volumes. Potential bidders base their calculations upon this data.

However, should there be significant differences between the details provided and reality, the winning bidder can make a claim for changes to the contract – especially in terms of payment. The construction phase represents one of the biggest risks - particularly as the road may not be open and therefore the concessionaire would not be receiving any toll revenue.

The moment the contract is signed, “the partnership ends and the fighting begins. Once the contract is signed it’s a zero-sum game: my gain is your loss,” said José Viegas, secretary general of the 1102 International Transport Forum.

He urged delegates, which included local authorities, concessionaires and contractors, to cooperate and not let lawyers take control.

One of the biggest changes in the tolling industry working its way through the system is European Union Directive 2014/23/EU which redefines the European model of a concession. In the new regulations, the concessionaire must accept the risk of failure. In tolling that often relates to unexpected difficulties during construction of the volume of traffic that use the new road. This introduces a degree of uncertainly which, Guy Chetrit of the 1054 European Investment bank, told the conference, means “PPPs [public-private partnerships] are not the right vehicle for funding toll road construction as a PPP needs certainty.”

For more information on companies in this article

Related Content

  • Key deals show strength of Tolling solutions sector
    September 26, 2013
    The world’s leading tolling solution providers have achieved significant deals in recent months emphasising the importance of their latest and proven technology. Guy Woodford reports Kapsch TrafficCom North America (Kapsch), part of Kapsch TrafficCom Group, has been awarded a five-year US$30 million contract by Canadian Tolling Company International (Cantoll). The contract will see the leading tolling technology manufacturer supply its next generation TDMA V6 Interior Transponder, also known as an onboar
  • Promoting advances in sustainable roads worldwide
    April 12, 2012
    Professor Martin Snaith, O.B.E., introduces an annual gathering that has grown over the years to become perhaps the world's foremost professional development forum promoting advances in sustainable roads worldwide. Over more than 15 years the Senior Road Executives Programme (SRE), organised by the internationally renowned Highways Group of the University of Birmingham, UK, in association with IRF, has established a worldwide reputation for providing top-quality professional development for executives worki
  • Merseylink wins US$3.12bn Mersey Gateway Project contract
    June 20, 2013
    Merseylink was today announced as the preferred bidder for the US$3.12 billion (£2bn) Mersey Gateway Project in North West England. Making the announcement together in the observatory in the Catalyst Museum in Widnes overlooking the River Mersey, Halton Borough Council and Merseylink also confirmed they have jointly identified savings amounting to “tens of millions of pounds” on the projected public sector contribution to the project budget.
  • Free flow tolling technology is booming
    April 10, 2013
    Jon Masters reports on the latest moves in the free-flow tolling segment. Free-flow tolling of roads and discrete infrastructure, such as bridges and tunnels, is an area of transportation that appears to be booming. Tolling in general is on the up, often still as a means for funding road projects where public sector budgets can no longer cover the necessary costs, but not exclusively so. Several high profile examples of road user charging for ‘demand management’ – the reduction of congestion as part of a wi