Skip to main content

Aceh Road Rehabilitation project wins key IRF GRAA award

The 9.1 magnitude earthquake and resulting series of tsunamis that struck Sumatra, Indonesia, in 2004 destroyed communities in 11 countries. Hardest hit was the Indonesian province of Aceh; an estimated 174,000 people were killed and 500,000 displaced. Basic infrastructure was left in ruin while the primary road along the west coast was destroyed. Vehicles making the trip had to navigate unpaved gravel roads, one-lane temporary bridges, and improvised ferries. Given the cataclysmic events that devastated th
May 15, 2014 Read time: 3 mins
Aceh Road ribbon cutting ceremony
The 9.1 magnitude earthquake and resulting series of tsunamis that struck Sumatra, Indonesia, in 2004 destroyed communities in 11 countries.

Hardest hit was the Indonesian province of Aceh; an estimated 174,000 people were killed and 500,000 displaced. Basic infrastructure was left in ruin while the primary road along the west coast was destroyed. Vehicles making the trip had to navigate unpaved gravel roads, one-lane temporary bridges, and improvised ferries. Given the cataclysmic events that devastated the Banda Aceh region and its ability to conduct economic activity, United States Agency for International Development (1372 USAID) stepped forward and signed a Strategic Objective Agreement with the 1065 Indonesian Government for tsunami-related post relief activities, which included the reconstruction and rehabilitation of the national coastal road between the provincial capital of Banda Aceh and Calang, the government centre of the Aceh Jaya District. USAID employed 3220 Parsons to design and manage construction of the road.

The design of the new road had to take into account Aceh’s unique blend of rainforest, coastal swamplands, and steep limestone hills. The alignment’s design also had to comprise segments of new road to replace roads that had disappeared where the coastline was reshaped. USAID made an important decision to focus on the quality, safety, and durability of the new road at the expense of quick completion. Instead of simply reconstructing the pretsunami road, which in large part would have involved overlaying and following the alignment of the 6m-wide, two-lane road, an 11m-wide road that included 2m paved shoulders and built to a higher national standard was provided. Where possible, the road was also constructed inland from the coast and on higher ground to improve its durability. The scope of the reconstruction ultimately comprised 145 km of road, as well as 27 steel truss and concrete bridges and 273 drainage culverts.
With consideration of the plight of the region and the immediate need for a paved road, USAID awarded a priority contract to 5207 Wijaya Karya for the immediate construction of a mainly new road in the highly travelled northern area approaching Banda Aceh. USAID subsequently awarded two additional contracts to Ssangyong and 5206 Hutama Karya to construct the remainder of the road. The decision to provide sections of new alignment carried risk. Getting legal access to the land needed for the right of way involved the procurement of more than 4,000 properties. This figure is tragically large because many of the landowners at the time of the tsunami were killed while official records of land titles and property ownership were washed away.

USAID managed a reconstruction effort challenged by many obstacles. Team building with government leaders was essential to overcome major local roadblocks. The Aceh Road project helped the Aceh province recover from a devastating natural disaster and significantly improved the quality of life throughout the region. In the process, it contributed to peace and stability in a once troubled region.

More information at: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Parsons.com/projects/pages/aceh-road.aspx website: www.parsons.com/projects/pages/aceh-road.aspx false http://www.parsons.com/projects/pages/aceh-road.aspx false false%>


2014 GRAA Applications

The Global Road Achievement Awards (GRAA) is a one-of-a-kind competition to recognize innovative road projects and exemplary people that place the road industry at the forefront of worldwide social and economic development. Entries should be submitted by June 30, 2014.

More information at %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.irfnews.org/graa website: www.irfnews.org/graa false http://www.irfnews.org/graa false false%>











For more information on companies in this article

Related Content

  • Road safety awards opening for entries
    April 6, 2017
    Road markings specialist Evonik is opening its road safety awards for entries. The firm was a pioneer of MMA cold plastic road markings and established its awards system last year in a bid to help improve road safety and disseminate best practices. Following the successful introduction of these awards last year, Evonik will again elect and award a public authority for its efforts in improving road safety. The winner of this award will be selected by an independent jury consisting of international road safet
  • VIDEO: People see red over white elephant of a blue bike lane
    November 1, 2016
    The Scottish roads authority has backpedalled on its recently improved cycle lane along a major route on the south-west coast, close to the city of Ayr.

    Amid local authority concerns over traffic congestion and one man’s media-grabbing protest, the cycle lane will now be ripped out – after being installed this summer.

    As the video shows, it is a protected wide lane, often painted blue. Cars appear to travel freely beside it.
  • Oregon’s electric vehicles cruise the West Coast Electric Highway
    December 3, 2014
    Many US states offer cash-back deals and tax breaks to encourage people to buy more electric vehicles. But Oregon has shunned financial incentives and opted to drive up EV sales through increasing the number of recharging stations.
  • CEI enters concrete plant market
    January 6, 2017
    CEI Enterprises is now developing a full new line of concrete production plants. This takes the firm, part of Astec Industries, into a new business segment and CEI is working on the engineering required as well as planning its manufacturing and marketing operations for these units. The range will include nine new designs of concrete plants and will include both traditional batch plants and innovative new plant technologies.