Skip to main content

Aceh Road Rehabilitation project wins key IRF GRAA award

The 9.1 magnitude earthquake and resulting series of tsunamis that struck Sumatra, Indonesia, in 2004 destroyed communities in 11 countries. Hardest hit was the Indonesian province of Aceh; an estimated 174,000 people were killed and 500,000 displaced. Basic infrastructure was left in ruin while the primary road along the west coast was destroyed. Vehicles making the trip had to navigate unpaved gravel roads, one-lane temporary bridges, and improvised ferries. Given the cataclysmic events that devastated th
May 15, 2014 Read time: 3 mins
Aceh Road ribbon cutting ceremony
The 9.1 magnitude earthquake and resulting series of tsunamis that struck Sumatra, Indonesia, in 2004 destroyed communities in 11 countries.

Hardest hit was the Indonesian province of Aceh; an estimated 174,000 people were killed and 500,000 displaced. Basic infrastructure was left in ruin while the primary road along the west coast was destroyed. Vehicles making the trip had to navigate unpaved gravel roads, one-lane temporary bridges, and improvised ferries. Given the cataclysmic events that devastated the Banda Aceh region and its ability to conduct economic activity, United States Agency for International Development (1372 USAID) stepped forward and signed a Strategic Objective Agreement with the 1065 Indonesian Government for tsunami-related post relief activities, which included the reconstruction and rehabilitation of the national coastal road between the provincial capital of Banda Aceh and Calang, the government centre of the Aceh Jaya District. USAID employed 3220 Parsons to design and manage construction of the road.

The design of the new road had to take into account Aceh’s unique blend of rainforest, coastal swamplands, and steep limestone hills. The alignment’s design also had to comprise segments of new road to replace roads that had disappeared where the coastline was reshaped. USAID made an important decision to focus on the quality, safety, and durability of the new road at the expense of quick completion. Instead of simply reconstructing the pretsunami road, which in large part would have involved overlaying and following the alignment of the 6m-wide, two-lane road, an 11m-wide road that included 2m paved shoulders and built to a higher national standard was provided. Where possible, the road was also constructed inland from the coast and on higher ground to improve its durability. The scope of the reconstruction ultimately comprised 145 km of road, as well as 27 steel truss and concrete bridges and 273 drainage culverts.
With consideration of the plight of the region and the immediate need for a paved road, USAID awarded a priority contract to 5207 Wijaya Karya for the immediate construction of a mainly new road in the highly travelled northern area approaching Banda Aceh. USAID subsequently awarded two additional contracts to Ssangyong and 5206 Hutama Karya to construct the remainder of the road. The decision to provide sections of new alignment carried risk. Getting legal access to the land needed for the right of way involved the procurement of more than 4,000 properties. This figure is tragically large because many of the landowners at the time of the tsunami were killed while official records of land titles and property ownership were washed away.

USAID managed a reconstruction effort challenged by many obstacles. Team building with government leaders was essential to overcome major local roadblocks. The Aceh Road project helped the Aceh province recover from a devastating natural disaster and significantly improved the quality of life throughout the region. In the process, it contributed to peace and stability in a once troubled region.

More information at: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.Parsons.com/projects/pages/aceh-road.aspx website: www.parsons.com/projects/pages/aceh-road.aspx false http://www.parsons.com/projects/pages/aceh-road.aspx false false%>


2014 GRAA Applications

The Global Road Achievement Awards (GRAA) is a one-of-a-kind competition to recognize innovative road projects and exemplary people that place the road industry at the forefront of worldwide social and economic development. Entries should be submitted by June 30, 2014.

More information at %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.irfnews.org/graa website: www.irfnews.org/graa false http://www.irfnews.org/graa false false%>











For more information on companies in this article

Related Content

  • Doka chalks up sales revenue success
    April 18, 2013
    Globally renowned Austrian formwork company Doka has almost tripled its sales revenue in the last 12 years and is aiming for greater success in 2013, according to Group chairman Josef Kurzmann. Kurzmann said the firm recorded sales revenue of €853million in 2012, compared to €326million in 2000. Additionally, the percentage of non-European sales revenue accrued by Doka had increased from 6% in 2000 to 42% in 2012. To achieve further sales revenue growth, Kurzmann said Latin America, North America and India
  • IRF accepting Fellowship programme applications
    July 14, 2014
    The International Road Educational Foundation is now accepting applications for its IRF Fellowship Programme. The Class of 2016 will start its first Semester in Autumn 2015. Students selected for the Class of 2016 will also participate in the 10-day IRF Road Scholar Program, held in Washington, DC in January. The IRF Fellowship Program provides a graduate level scholarship to young professionals who have strong academic backgrounds, professional qualifications, leadership potential, and a commitment to retu
  • New Zealand: 10-year plan sets out road infrastructure spending
    December 19, 2014
    New Zealand will spend US$30 billion over the next decade on public transport, including road works not just in major urban areas but in the provinces. The announcement was made by Transport Minister Simon Bridges after the government approved the draft Government Policy Paper 2015. The approved document takes into consideration concerns by local government that their transport infrastructure needs would be ignored in favour of those for large urban areas, the New Zealand Herald newspaper reported.
  • Hidromek launches HMK300 LC LR long reach excavator
    January 6, 2017
    Hidromek’s new HMK300LC LR long reach excavator can be used for demolition work. It is part of the company’s Gen Series Excavator Range, which has secured numerous design awards in countries including the United States, Germany and the firm’s native Turkey. Along with all Gen Series machines, the 300LC has a spacious cabin for maximum operator comfort, and a hi-tech yet easy-to-handle control panel. It also comes with a six-cylinder Isuzu engine producing up to 150.6kW of power. Offering a standard model bu