Skip to main content

New telehandler platform from JCB

A new development from JCB is an access platform attachment for use with the firm’s 535-140 and 535-128 model telehandlers. This has been developed to meet growing market demand for access platform attachments that can be used on telehandlers in a range of construction duties. Designed for use in finishing work or tunnel construction for example, the platform is offered in three versions with the basic fixed unit, an extending model and one that both slews and extends. The basic fixed unit measures 1.5x2.5m
June 15, 2012 Read time: 2 mins
A new development from 255 JCB is an access platform attachment for use with the firm’s 535-140 and 535-128 model telehandlers.

This has been developed to meet growing market demand for access platform attachments that can be used on telehandlers in a range of construction duties. Designed for use in finishing work or tunnel construction for example, the platform is offered in three versions with the basic fixed unit, an extending model and one that both slews and extends. The basic fixed unit measures 1.5x2.5m, while the extending model is 1.2m wide and offers extension from 2.5-5m. The top-of-the-line version offers a 400kg capacity, 180° of slew as well as being 1.2m wide and extending from 2.5-5m. Fitted to the 535-140 telehandler the platforms provide working heights of up to 15.6m. Safety features are fitted such as a single key interlock, an interlock on the boom, hose burst protection and rear axle stabilisation for the telehandler.

For more information on companies in this article

Related Content

  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Easy operating
    July 31, 2012
    Modern asphalt plants are a far cry from the early models, and are capable of producing a wide variety of mixes at the touch of a button. Patrick Smith reports Cutting-edge software-based control technology makes today's asphalt mixing plants simple and efficient to operate. The tightening of clean air regulations is reducing the emissions from the plants, and the current focus is on the goal of raising the processed portion of reclaimed asphalt (RA) towards 100%, says Ammann Group, which has been involved
  • Compaction innovations from key firms
    June 12, 2018
    The major manufacturers are introducing an array of advanced asphalt compaction machines - Mike Woof writes. New compaction machines are coming to market from an array of manufacturers, aiming to increase output and efficiency for road contractors. One of the most notable developments is with Hamm’s launch of a production hybrid compactor model, while other firms say they are also working on similar systems. However, several manufacturers have introduced new and improved machines with superior performance t
  • Machine control innovations from Trimble
    November 8, 2016
    New advances in machine control systems are revolutionising the construction industry - Mike Woof writes Trimble is working on innovations for machine control to meet demand for highly sophisticated solutions, as well as for more simple equipment. Major developments in available technology will provide revolutionary advances in efficiency and productivity as a result.