Skip to main content

New telehandler platform from JCB

A new development from JCB is an access platform attachment for use with the firm’s 535-140 and 535-128 model telehandlers. This has been developed to meet growing market demand for access platform attachments that can be used on telehandlers in a range of construction duties. Designed for use in finishing work or tunnel construction for example, the platform is offered in three versions with the basic fixed unit, an extending model and one that both slews and extends. The basic fixed unit measures 1.5x2.5m
June 15, 2012 Read time: 2 mins
A new development from 255 JCB is an access platform attachment for use with the firm’s 535-140 and 535-128 model telehandlers.

This has been developed to meet growing market demand for access platform attachments that can be used on telehandlers in a range of construction duties. Designed for use in finishing work or tunnel construction for example, the platform is offered in three versions with the basic fixed unit, an extending model and one that both slews and extends. The basic fixed unit measures 1.5x2.5m, while the extending model is 1.2m wide and offers extension from 2.5-5m. The top-of-the-line version offers a 400kg capacity, 180° of slew as well as being 1.2m wide and extending from 2.5-5m. Fitted to the 535-140 telehandler the platforms provide working heights of up to 15.6m. Safety features are fitted such as a single key interlock, an interlock on the boom, hose burst protection and rear axle stabilisation for the telehandler.

For more information on companies in this article

Related Content

  • Work begins on Stockholm’s new bypass
    August 22, 2016
    The first tunnels are being excavated for the huge bypass tunnel in Sweden’s capital Stockholm – Adrian Greeman writes. After years of preparation and design, blasting and rock moving for Sweden's largest infrastructure project began south of the city this year. It sets in train a decade-long project that will create a new half-ring dual three-lane motorway for the city, 20km long. With most of it deep underground, it will also be one of Europe's largest ever road tunnels. The scheme is aimed at transformin
  • Productive recycling from BOMAG
    May 15, 2017
    According to BOMAG its powerful new RS500 recyclyer/stabiliser is already proving its worth on construction sites in Germany and France. Every construction site has its special requirements and places different demands on people and machines. Since the start of series production, the RS 500 recycler/stabiliser has been able to contribute its versatility on a number of diverse construction sites. On the A 39 Autobahn near Winsen (Luhe) for example, where 8,000m² was processed/day at a working depth of 200mm,
  • Productive recycling from BOMAG
    May 15, 2017
    According to BOMAG its powerful new RS500 recyclyer/stabiliser is already proving its worth on construction sites in Germany and France. Every construction site has its special requirements and places different demands on people and machines. Since the start of series production, the RS 500 recycler/stabiliser has been able to contribute its versatility on a number of diverse construction sites. On the A 39 Autobahn near Winsen (Luhe) for example, where 8,000m² was processed/day at a working depth of 200mm,
  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.