Skip to main content

New telehandler platform from JCB

A new development from JCB is an access platform attachment for use with the firm’s 535-140 and 535-128 model telehandlers. This has been developed to meet growing market demand for access platform attachments that can be used on telehandlers in a range of construction duties. Designed for use in finishing work or tunnel construction for example, the platform is offered in three versions with the basic fixed unit, an extending model and one that both slews and extends. The basic fixed unit measures 1.5x2.5m
June 15, 2012 Read time: 2 mins
A new development from 255 JCB is an access platform attachment for use with the firm’s 535-140 and 535-128 model telehandlers.

This has been developed to meet growing market demand for access platform attachments that can be used on telehandlers in a range of construction duties. Designed for use in finishing work or tunnel construction for example, the platform is offered in three versions with the basic fixed unit, an extending model and one that both slews and extends. The basic fixed unit measures 1.5x2.5m, while the extending model is 1.2m wide and offers extension from 2.5-5m. The top-of-the-line version offers a 400kg capacity, 180° of slew as well as being 1.2m wide and extending from 2.5-5m. Fitted to the 535-140 telehandler the platforms provide working heights of up to 15.6m. Safety features are fitted such as a single key interlock, an interlock on the boom, hose burst protection and rear axle stabilisation for the telehandler.

For more information on companies in this article

Related Content

  • Italian stabilization efficiency from FAE
    March 18, 2016
    Italian firm FAE continues to develop its recycling technology, now offering two stabiliser packages for large and small operations. The smaller SSM and SSM/HP units operate with working depths down to 400mm. Meanwhile the larger SSH unit has a working width of 2.5m, suits towing machines with power outputs from 120-300kW, and can handle working depths down to 500mm. A key development is the firm’s innovative automatic injection system (AIS), which now offers a more efficient and effective mixing of wate
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Latest earthmoving machines noticeably quieter
    February 20, 2012
    One of the most strikingly apparent features of the new Tier 4 Interim/Stage IIIB rated construction machines is the noise, or rather the lack of it. With engines running at usual operating speed, these emissions compliant machines are noticeably quieter.
  • More efficient asphalt output from new plants
    November 20, 2015
    Advances in asphalt plant design offer major gains in product throughput and quality, while also allowing for warm asphalt and increased recycling The asphalt sector is constantly looking for ways to optimise production, lower costs and improve product quality and consistency. Competition is fierce in the asphalt plant market, with several of the key companies working hard to develop new and more efficient technologies, as well as equipment that is more versatile and more mobile. Advances have been made