Skip to main content

Fast road repairs

ASI Solutions has developed a fast pothole repair technique in the shape of its Rhinopatch process. This comes with a life-time guarantee and is said to offer a fast repair solution when a pothole or other road surface defect fails. The firm says that using this technique means that there is no need for a works team to re-visit a site and further disrupt traffic. The solution is to provide a road repair using replacement material of a superior quality to the existing road surface and to eliminate any joints
May 3, 2012 Read time: 2 mins
3124 ASI Solutions has developed a fast pothole repair technique in the shape of its Rhinopatch process. This comes with a life-time guarantee and is said to offer a fast repair solution when a pothole or other road surface defect fails. The firm says that using this technique means that there is no need for a works team to re-visit a site and further disrupt traffic. The solution is to provide a road repair using replacement material of a superior quality to the existing road surface and to eliminate any joints through the use of heat welding when reinstating the damaged area. The completed road repair is then treated with a proven asphalt preservative to ensure the longevity of the surface. Infrared heat is used and the firm also provides a comprehensive Rhinopatch training regime for contractors using the technique to ensure quality.

The process is said to be suitable for all types of asphalt wearing course, including surface dressing. ASI has also tackled issues surrounding temporary repairs by developing a cold bagged material made from 100% recycled aggregate and a proprietary heat activated Gilsonite emulsion specifically designed to work with the Rhinopatch system. This material can be used by highway authorities to fill emergency response defects and following the emergency repair, a crew can return with ASI's infrared equipment to weld the material into the surrounding surface and provide a Rhinopatch repair. The technique does not require the use of compressed air picks so it is safer and quieter. The process recycles all waste in-situ and results in a joint-free repair that does not spoil the look of the original surface. The system can be used for all types of surface repairs up to 100mm depth including joint failures, trench reinstatements, pavement defects, around ironwork and potholes.

According to ASI, the Rhinopatch system eliminates waste by recycling all existing material and reduces the need for new aggregate extraction by 90%. This also eliminates the need for hand-held power tools that can cause hand/arm vibration injuries, cuts manual handling injuries, and reduces traffic disruptionand lowers CO2 emissions by 85%.

For more information on companies in this article

Related Content

  • Massenza’s new vision for 2014
    March 12, 2014
    Massenza has started 2014 with a new approach to its range of bitumen emulsion plants, streamlining its four larger models into two, and adding a smaller plant. This has allowed Massenza to optimise the design and components for each size of plant, which in turn allows the company to offer its customers a more competitive deal. At the same time, Massenza has made three major technical improvements to the plants: a new type of material for the water tank which resists corrosion; a new dosing system for th
  • Rural road resurfacing to boost safety
    October 21, 2016
    Rebuilding a local road in southern Germany will provide users with a safer route, particularly in poor weather conditions. Black Forest-based contractor Waltersbacher has used a tracked AFT 500 asphalt paver from Ammann to resurface a local road in the municipality of Glatten, near Baiersbronn. The contractor has used a number of smaller Ammann compaction units in the past. So when it won the contract to upgrade the road the firm opted to buy the AFT 500 to handle this work, as well as other jobs r
  • Breathing Ecological Roads – GRAA winner
    May 10, 2018
    The IRF office in Washington has presented an award to revolutionary ecological permeable pavement that helps avoid heat islands Climate specialists and town planners everywhere are increasingly aware of the thermal impacts of city pavements which trap heat on hot summer days, and are known as “urban heat islands”. These heat islands can adversely impact the sustainability of cities by increasing the dependence on mechanical cooling. Permeable pavements, such as porous asphalt, offer some relief but typi
  • Adding road shoulders efficiently
    April 1, 2022
    Road Widener is now offering its patented FH-R shouldering and side paver attachment.