Skip to main content

Chicago Pneumatic supplying lighting for Middle East

Chicago Pneumatic has secured a major sale of its durable LED light towers in Kuwait. The firm’s authorised distributor General Transportation & Equipment Company (GTE) placed an order for 25 CPLT V15 LED models. The light towers will provide crucial illumination for a time-sensitive construction project being carried out by local contractor Al-Yousifi Engineering & Construction. GTE was originally asked to provide metal halide light towers by the contractor. However, due to the time and cost-sensitive
November 9, 2017 Read time: 3 mins
This order represents the first sale of CPLT V15 LED light towers in the Middle East

6097 Chicago Pneumatic has secured a major sale of its durable LED light towers in Kuwait

The firm’s authorised distributor General Transportation & Equipment Company (GTE) placed an order for 25 CPLT V15 LED models. The light towers will provide crucial illumination for a time-sensitive construction project being carried out by local contractor Al-Yousifi Engineering & Construction. 

GTE was originally asked to provide metal halide light towers by the contractor. However, due to the time and cost-sensitive nature of the development, GTE advised the client to consider more efficient LED models. As Ejazul Hassan, equipment sales manager for GTE, said “The CPLT V15 LED is highly efficient, making it ideal for projects requiring a large number of light towers. With this model, users can save on both fuel and maintenance costs. For instance, the LED’s lifespan is 30,000 hours, compared to 6,000 hours provided by a metal halide bulb. This means the CPLT V15 LED’s bulbs don’t need to be replaced for approximately three years.”

To highlight the benefits of opting for LED, GTE carried out a demonstration. The contractor’s technical team observed the features of both units, from the quality of illumination and compactness of the machines to noise levels. “When we were doing the demonstration, one of the team asked me if the light tower’s engine was running because he couldn’t hear it,” said Hassan.

The CPLT V15 LED also showed low operational costs and high light coverage. The LED unit provides savings of around 2,000 litres of fuel/2,000 hours of operation. “The LED offered 150 hours of continuous runtime compared to 57 hours provided by the metal halide model,” said Hassan. The CPLT V15 LED was shown to be capable of covering a 5,000m2 area while the metal halide model could only illuminate an area of up to 4,000m2. After the demonstration the contractor’s technical team decided to retain the LED demo unit and ordered 24 more light towers. Because of the harsh conditions that the light towers are likely to operate within, the CPLT V15 LED features a durable polyethylene canopy that protects vital internal components. The canopy features wide doors to allow easy maintenance access to the machine, including service components and drains. The light tower also has a frame that prevents any excess fluid escaping.

Even in demanding conditions, the CPLT V15 LED offers good safety on site due to its four heavy-duty stabilisers and level indicator. The light tower’s compact and lightweight design makes it easy to move. It can also be transported with the mast in the vertical position, allowing safer transportation and installation.

For more information on companies in this article

Related Content

  • Florida road repaving delivers better surfacing
    April 7, 2017
    Paving the road for Florida’s latest mega project is the job of Volvo CE equipped concrete and asphalt specialist Ajax Paving Industries. Florida’s Gulf Coast provides a strong draw for tourists and residents alike, with coastal cities like North Port featuring a humid subtropical climate, beaches and resorts. But beyond the city’s sandy beaches, the streets of North Port had fallen into disrepair, causing transportation troubles.
  • 'Quiet' work in Stockholm
    July 24, 2012
    Aquajet's new Ecosilence Power Pack has been tested to its limits on the tunnel/bridge renovation work in the city's historic Old Town and has exceeded all expectations, according to E-Schakt's project supervisor, Andreas Nordstrom. Equipment from the Swedish company, including Ecosilence making its debut, is being used in the tunnel and on the 1.2km Central Bridge (or 'Three Bridges'), which was built in the 1950s and which links the northern district of Norrmalm and the southern district of Södermalm. It
  • A wheely great bridge for the English city of Hull
    November 6, 2019
    A 60m pre-constructed pedestrian bridge weighing 150 tonnes as been wheeled into position over the A63 in the northern English city of Hull. The covered and vaulted Princess Quays Bridge will be renamed when it opens in the spring enabling pedestrians and cyclists to cross over the busy dual carriageway. The positioning operation meant that first the route was cleared of signage, guardrails and street lights. The bridge was then lowered onto two wheeled transporters – one at each end of the structur
  • Reduced temperature asphalt in road construction
    January 17, 2022
    The use of reduced temperature asphalt in a road construction project in Germany has helped to lower emissions