Skip to main content

Caterpillar adds to its demolition and sorting grapple range

Caterpillar’s tools division has added three tools to its G300 series of demolition and sorting grapples. Caterpillar Work Tools, based in the Netherlands, now offers the G310 GC, G313 GC and G315 GC grapples for hydraulic excavators with operating weights between 10-19tonnes. The units are specifically for sorting out debris at source, loading and unloading containers or stripping a building before demolition. The G300 GC grapples are available with a fixed upper head or with a top plate for mountin
May 19, 2015 Read time: 2 mins
Caterpillar gets to grips with grapples
178 Caterpillar’s tools division has added three tools to its G300 series of demolition and sorting grapples.

Caterpillar Work Tools, based in the Netherlands, now offers the G310 GC, G313 GC and G315 GC grapples for hydraulic excavators with operating weights between 10-19tonnes. The units are specifically for sorting out debris at source, loading and unloading containers or stripping a building before demolition.

The G300 GC grapples are available with a fixed upper head or with a top plate for mounting an adapter bracket allowing the unit to be used with other equipment providers. But when used with the dedicated Cat CW Quick Coupler, the grapple can be exchanged in seconds for other Cat work tools. Cat excavators have pre-programmed hydraulic settings to accommodate G300 series grapples.

Because the new tools are built for demolition and sorting applications, they have a low height and feature a durable shell and hinge design. Hydraulic components are fully protected and the one-piece push-bar provides powerful closing forces for the grab shells. The G300 GC series also features hydraulic, 360° rotation, enabling the grapple to approach material from almost any angle with little need to move the carrier.

The perforated shells offer optimal view during operation. The square design allows maximum accessibility to material and the smooth inner surface of the shells and their high clearance promote optimal loading.

For more information on companies in this article

Related Content

  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642
  • Plant advances for asphalt production boost efficiency
    May 30, 2018
    Advances in asphalt plant technology will boost efficiency for producers, while increasing the percentage of recycled materials that can be used in the mix - Mike Woof writes. Asphalt plant technology continues to advance as the rival firms fine-tune their technologies for greater performance. New plants can give higher quality output due to new control technologies, while also allowing for recycled asphalt pavement (RAP) to be used more efficiently, while still ensuring tight mix specifications are met. A
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • E series breakers expand Caterpillar line-up
    January 6, 2017
    There are three additional models in Caterpillar’s E Series hydraulic breaker range. The H140Es, H160Es and H180Es are designed for use on medium and large excavators from the Cat 324E to the 374E.