Skip to main content

Upgrade of Lánchíd Bridge by May

Four tenders in for work on Budapest’s Chain Bridge - Széchenyi Lánchíd.
By David Arminas December 23, 2020 Read time: 2 mins
Budapest Széchenyi Lánchíd Bridge upgrade to start by mid-2021 (photo © Julianelliott/Dreamstime)

Upgrade work on the Hungarian capital's Chain Bridge will be underway by May, according to Napi.hu, a Hungarian online business news portal.

The bridge, officially the cast iron suspension Széchenyi Lánchíd, was built in 1849 as the first permanent bridge across the Danube River in Hungary. Although it was designed by English engineer William Tierney Clark and built by Scottish engineer Adam Clark, it was named after István Széchenyi, a major supporter of its construction.

Four local companies have tendered for the repair work - Strabag Altalanos Epito, SDD Konzorcium, Kozgep Epito- es Femszerkezetgyarto and A-Hid Epito. A winner is expectedc to be chosen early next year.

Upgrading has been at least two-years in the planning to improve the 380m-long, 14.8m-wide bridge. Cost issues  have hampered renovation planning

At the time of construction, its centre span of 202m was one of the longest in the world. The bridge has the official name of István Széchenyi, a major supporter of its construction, although it is commonly called the Chain Bridge.

The bridge was updated and strengthened in 1914 but during World  War Two it was destroyed in January 1945 by the retreating German occupation army. It was rebuilt by 1949 and remains as one  of only two surviving two bridges designed by William Tierney Clark. The other is the suspension bridge over the Thames at Marlow, England.

Related Content

  • Cowi and Dissing+Weitling win Shenzhen and Zhongshan bridge deal
    April 18, 2016
    Engineering group Cowi and architecture firm Dissing+Weitling have won the tender for construction of a bridge and tunnel project to connect the Chinese cities of Shenzhen and Zhongshan. The US$5.51 billion 24km project in the southern province of Guangdong will include the world’s widest immersed road tunnel, two signature suspension bridges and two artificial islands. The road in the Pearl River Delta will have eight traffic lanes in two directions and a daily capacity of 90.000 cars, according to a
  • Highways England: Lower Thames consultation
    July 14, 2021
    Earlier this year, Highways England announced that the three joint ventures, BFV, Bouygues Murphy and Dragados-Hochtief will be invited to enter into a competitive dialogue.
  • Fehmarn Belt Tunnel opening set for mid-2029
    August 16, 2024
    Around 1,500 tonnes of reinforcement for casting the concrete tunnel elements are produced weekly for the 17.6km Fehmarn Belt Tunnel that will connect the Danish island of Lolland with the German island of Fehmarn.
  • Højgaard and BESIX win Nordhavn Tunnel work
    September 16, 2022
    The €349.6 million Nordhavnstunnel contract in the capital Copenhagen was awarded by the Danish Road Directorate / Vejdirektoratet.