Skip to main content

Upgrade of Lánchíd Bridge by May

Four tenders in for work on Budapest’s Chain Bridge - Széchenyi Lánchíd.
By David Arminas December 23, 2020 Read time: 2 mins
Budapest Széchenyi Lánchíd Bridge upgrade to start by mid-2021 (photo © Julianelliott/Dreamstime)

Upgrade work on the Hungarian capital's Chain Bridge will be underway by May, according to Napi.hu, a Hungarian online business news portal.

The bridge, officially the cast iron suspension Széchenyi Lánchíd, was built in 1849 as the first permanent bridge across the Danube River in Hungary. Although it was designed by English engineer William Tierney Clark and built by Scottish engineer Adam Clark, it was named after István Széchenyi, a major supporter of its construction.

Four local companies have tendered for the repair work - Strabag Altalanos Epito, SDD Konzorcium, Kozgep Epito- es Femszerkezetgyarto and A-Hid Epito. A winner is expectedc to be chosen early next year.

Upgrading has been at least two-years in the planning to improve the 380m-long, 14.8m-wide bridge. Cost issues  have hampered renovation planning

At the time of construction, its centre span of 202m was one of the longest in the world. The bridge has the official name of István Széchenyi, a major supporter of its construction, although it is commonly called the Chain Bridge.

The bridge was updated and strengthened in 1914 but during World  War Two it was destroyed in January 1945 by the retreating German occupation army. It was rebuilt by 1949 and remains as one  of only two surviving two bridges designed by William Tierney Clark. The other is the suspension bridge over the Thames at Marlow, England.

Related Content

  • Acrow lends critical support for the Cradock Bridge renovation
    October 28, 2016
    International bridge engineering and supply company Acrow recently installed a modular steel structure to maintain traffic flow during renovation of the historic Cradock Bridge in the US The bridge spanning the Mystic River in Medford, a suburb of Boston, Massachusetts, was built in 1637, then rebuilt in 1880 and again rehabilitated in 1934. It was determined to be structurally deficient several years ago - one of many of state-owned bridges - and was put into the state’s Accelerated Bridge Program. W
  • Romania eyes new Danube River bridge
    August 20, 2024
    The announcement by Romania’s minister for transport, Sorin Grindeanu, comes as the Friendship Bridge, connecting Giurgiu in Romania and Ruse in Bulgaria, is closed for repairs.
  • The Preston Western Distributor
    September 7, 2023
    Costain, as main contractor for the Preston Western Distributor project, was involved from the earliest stages, thanks to the UK’s Early Contractor Involvement approach. The project was delivered on time and on budget to the benefit of the local environment, local businesses and the region’s workforce. David Arminas reports*
  • Croatia’s Peljesac Bridge progressing
    June 11, 2020
    China Road and Bridge Corporation is working through the pandemic period.