Skip to main content

Ramboll appointed independent engineer on Champlain Bridge Project

Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada. Ramboll, based in Denmark, will work with the Canadian consultant Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America. Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion. “The ne
September 8, 2015 Read time: 2 mins
Proposed Champlain Bridge (artist impression)
6801 Ramboll has been appointed independent engineer for the planned Champlain Bridge Corridor project in Montreal, Canada.

Ramboll, based in Denmark, will work with the Canadian consultant 5346 Stantec to review the design and construction schedule of the entire length of the bridge corridor, one of the largest infrastructure projects in North America.

Stantec will review of all highway design along with site inspections for the project that will cross the St. Lawrence River and cost up to US$4.1 billion.

“The new contract is in line with Ramboll’s strategy for North America where we are pursuing several other larger bridge and tunnel projects,” said Lars Thorbek, head of Ramboll’s department for international bridges.

World Highways reported in April that the Canadian government had awarded the multi-billion dollar contract for the Champlain Bridge, in the province of Quebec, to a consortium led by SNC-Lavalin. The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal.

The consortium, called Signature on the Saint-Lawrence Group, includes Spanish firms 4761 Dragados Canada and ACS Infrastructures and the US firm 2758 Flatiron Construction. Other members are MMM Group, T.Y. Lin International, International Bridge Technologies Canada and 981 Hochtief PPP Solutions.

The project includes a new île des Soeurs Bridge along with reconstruction and widening of the federal portion of Autoroute 15. But the crown-jewel of the project is the New Champlain Bridge, a 3.4 km crossing of the main channel of the St. Lawrence River, which includes a cable stay section over the St. Lawrence Seaway.

Construction is set to begin in the summer of 2015. The New Champlain Bridge will be in service in 2018 and the rest of the corridor will be completed in 2019.

This past summer, Canada-based Canam-Bridge was chosen to fabricate the superstructure for the new bridge. Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, said at the time he expects at least 45,000tonnes of steel will be required for the 3.4km bridge.

For more information on companies in this article

Related Content

  • Spencer wins Menai Suspension Bridge refurb
    September 16, 2022
    The UK contract, worth nearly €1.8 million, is to repaint the entire main span underdeck of the 417m-long bridge, the second oldest operational vehicular suspension bridge in the world.
  • US$3.4 billion Peru PPP road partnership
    April 11, 2024
    A US$3.4 billion Peru PPP road partnership deal has been awarded for Lima.
  • Canada: National Bank and Axium refinance Sea-to-Sky Highway
    July 19, 2016
    National Bank Financial and Axium Infrastructure have refinanced the Sea-to-Sky Highway Improvement Project in the Canadian province of British Columbia. A statement from Axium said that the US$427 million 25-year public-private-partnership had “strong investor support and an A2 rating from Moody’s”. The Sea-to-Sky Highway Investment Limited Partnership - Axium Infrastructure, Régime de Rentes du Mouvement Desjardins and Nova Scotia Pension Agency - is the consortium in charge of the concession. In
  • Poland: A1 tender attracts 11 offers, including one from Strabag
    February 19, 2015
    Construction of a 15.2km section of Poland’s A1 motorway has attracted 11 bids. A Strabag consortium made the lowest bid for the section, between Pyrzowice and Rzasawa, coming in at €146 million. A consortium formed by Polaqua and Dragados was the second lowest, at €156.4 million. The highest bid was €183.4 million. The contract calls for a construction period of 30 months. Meanwhile, the province of Mazowsze, or Masovia, with its 5.5 million inhabitants and the capital Warsaw, will get nearly €2.1 billion