Skip to main content

Colombian concession contracts cause concern

A report from insurance firm AIG warns that up to half of Colombia's 4G highway concessions could face financial hurdles due to over-estimated predictions of traffic flows. Colombia is at present putting out to tender its fourth generation (4G) concessions, which involve some US$25 billion in investment, reports Business News America. This investment is impressive and is Latin America's biggest move to expand and improve road infrastructure. But while many companies have shown interest and were prequalified
June 13, 2014 Read time: 3 mins
A report from insurance firm AIG warns that up to half of Colombia's 4G highway concessions could face financial hurdles due to over-estimated predictions of traffic flows. Colombia is at present putting out to tender its fourth generation (4G) concessions, which involve some US$25 billion in investment, reports Business News America. This investment is impressive and is Latin America's biggest move to expand and improve road infrastructure. But while many companies have shown interest and were prequalified in the process, only a few groups submitted bids in the first tenders. The government has changed tender rules to ease financial access, and Latin 4900 American Development Bank CAF has said it would consider the creation of a private capital fund, with between $1 billion and $3 billion, to help finance the projects. The Plan calls for the construction of 8,000km of roads, with 1,200km of four-lane highways. Most of the projects are public-private partnerships. Once the concessions are awarded, works are expected to begin in 2015 and take until the end of the decade.

Meanwhile Colombia's National Infrastructure Agency (ANI) has submitted a project suggested by construction firm 3214 Odinsa for the Los Llanos route for approval. ANI hopes that the assessment will be concluded by late June 2014. If the project is approved, there will be a two-month period allowing other firms to bid. In the event that a better offer is made, there will be a quick selection process. Should no competitors emerge, Odinsa will be awarded the contract, as it proposed the project. This initiative is a 45km two-lane road and 71km single-lane road, plus 5km of bridges and maintenance of 264km. It will require $690.4 million, which will come from current toll revenues. Another such project being considered is the double-lane road between Ibague and Cajamarca propsed by Colpatria, Mincivil and other firms in the San Rafael concession. That project spans 35km including 16 tunnels and 14 bridges. Both projects could be awarded by September 2014 if there are no other offers. Private sector initiatives in the feasibility stage include the Cesar-Guajira connection put forth by 4882 El Condor, Corficolombiana's third sector of Bogota-Villavicencio and Cajamarca-La Paila, also by Odinsa. Awaiting approval are Cambao-Manizales by Promesa de Sociedad Futura Alternativas Viales for, Guaduas-Puerto Bogota by Concesion Sabana de Occidente, the Antioquia-Bolivar connection, also El Condor, and Tunja-Puerto Araujo by VM Colombia Logistica. The Boyaca bridge project presented by 3222 CSS Constructores for, third lane for Bogota-Girardot by Infracon for and the Sabana Norte road project by Promesa de Sociedad Futura Accenorte are all in the pre-feasibility stage. The ANI is starting its assessment of the Tunja-Chiquinquira project by Promesa de Sociedad Futura Transversales de Boyaca, Valledupar-La Paz by Pavcol and Villeta-Puerto Salgar by Promesa Sociedad Futura Conexion Vial del Sol.

For more information on companies in this article

Related Content

  • Delays for new bridge linking Brazil and Paraguay
    June 4, 2014
    Construction work on a new bridge connecting Brazil and Paraguay has suffered a further delay. The 760m suspension bridge itself is expected to cost in the order of US$102 million while the building of link roads and customs/immigration facilities bring the project total to some $170 million, according to a report by Business News Americas. Contractor Empresa Sul Americana de Montagens (EMSA) was originally thought to be the front runner for the project following its lowest cost bid of $101.78 million for t
  • Colombia’s longest bridge part of major project
    September 14, 2016
    Construction activity is underway on a number of key transport infrastructure projects in Colombia. A major bridge project spanning the Magdalena River is currently under construction close to the city of Barranquilla in the north of Colombia. The Pumarejo Bridge was commissioned by Instituto Nacional de Vías (INVIAS) and is being built by a consortium. Featuring a cable-stayed design, the bridge will be 2.28km in length, with three lanes for vehicles, as well as a pedestrian area and a cycle track in b
  • Five consortia vie for Paraguay’s first phase of bi-oceanic corridor
    March 14, 2016
    Five consortia are vying for the contract to pave 255km of Paraguay’s bi-oceanic corridor project - the Loma Plata-Carmelo Peralta road paving works. The five consortia are INECS, EPI, ACI Proyectos Cialpa, Geocon-MCSA and Loma Plata. The 255km contract is the first phase, costing US$300 million, of a 1,045km overall corrider that will need around $926 million. Tenders for the first phase were launched in November covering the section between Carmelo Peralta, Cruce Centinela and Loma Plata in the w
  • Paso de las Leña tunnel between Argentina and Chile
    December 22, 2016
    A new tunnel between Chile and Argentina will boost trade and transport between the two countries - Mauro Nogarin writes The international Tunnel Paso Las Leñas will stretch 11.5km at 2,050m above sea level through the Andes. Once complete, it will greatly improve the connectivity and integration between the Chilean O'Higgins region with the Argentine Mendoza region.