Skip to main content

Kubota UK invests €1.4 million at Thame site

Kubota has invested nearly €1.4 million to enhance operational performance and standards at its UK headquarters in Thame, England. The investment includes expanding its office and meeting room space and completed groundworks resurfacing for better traffic flow around the site. Also included has been refurbishment to its Training Academy and Research & Development Centre. Other improvements include installation of a cantilever racking system to streamline inventory processes and to hold more stock to maint
April 17, 2018 Read time: 1 min
1265 Kubota has invested nearly €1.4 million to enhance operational performance and standards at its UK headquarters in Thame, England.


The investment includes expanding its office and meeting room space and completed groundworks resurfacing for better traffic flow around the site. Also included has been refurbishment to its Training Academy and Research & Development Centre.

Other improvements include installation of a cantilever racking system to streamline inventory processes and to hold more stock to maintain its first-in, first-out supply method.

“The new office and meeting spaces for example give us the opportunity to continue to grow and evolve as a business,” said Solly Wilson, supply chain manager at Kubota UK.

“In the past 12 months, staff numbers at Thame have increased, highlighting the need for additional capacity. The new cantilever racking system also means we are far better equipped to allocate, monitor and transport products more effectively.”

For more information on companies in this article

Related Content

  • World of Asphalt exhibition success
    April 1, 2025
    The recent World of Asphalt exhibition proved a success.
  • Cost-saving benefits of dual layer asphalt paving
    February 14, 2012
    Sophisticated dual layer paving technologies currently on the market are said to offer major advantages to road builders. Roads built using twin layer, hot on hot paving techniques can last considerably longer than those constructed using conventional methods. Contractors and clients also stand to gain from savings on materials costs, through the elimination of the need for emulsion spraying between binder and wearing courses and with the use of thin layer wearing course designs. At present two paver man
  • “Bold and brave” rallying call to cash-starved UK highway maintenance teams
    July 24, 2012
    UK local authorities and other organisations must be “bold and brave” in their structuring of repair and maintenance works, delegates at a key road engineering conference in Birmingham, central England were told. Speaking at the Developments in Pavement Assessment (DIPA 2012) event Les Hawker, highways manager at Transport for London (TfL), said: “There is no extra money and only 20% of the [Government budget] cuts have taken place so far. Over the next five years the other 80% of cuts will come through. Or
  • UK road investment strategy questioned
    July 31, 2023
    A report from the House of Commons Transport Committee recommended cancellation of some major new projects such as the Stonehenge Tunnel and the Lower Thames Crossing.