Skip to main content

Taiwan bureau threatens Kuo Teng over its Kinmen Bridge work

Taiwan’s National Expressway Engineering Bureau said it would terminate its contract with Kuo Teng Construction company because of issues over the construction schedule of Kinmen Bridge. Work on the bridge connecting the main island of Greater Kinmen and Lieyu, also known as Little Kinmen, began in 2013 after it had been a campaign promise in five presidential elections. The bureau recently said that work on the bridge was nearly 19% behind schedule and reportedly gave the company 30 days to bring the pro
June 2, 2016 Read time: 2 mins
Taiwan’s National Expressway Engineering Bureau said it would terminate its contract with Kuo Teng Construction company because of issues over the construction schedule of Kinmen Bridge.

Work on the bridge connecting the main island of Greater Kinmen and Lieyu, also known as Little Kinmen, began in 2013 after it had been a campaign promise in five presidential elections.

The bureau recently said that work on the bridge was nearly 19% behind schedule and reportedly gave the company 30 days to bring the project back on schedule.

The Taipei Times reported that it could lead to a change of contractor for a third time.

Kuo Teng Construction has also been told to increase the number of workers, speed up material delivery to the site and to use more efficient equipment.

“The contractor failed to bring in partners that were equipped with better machinery for the project, even though it was facing a shortage of workers and construction materials and clearly lacks the ability to handle the project on its own,” the bureau said in a statement. “The contractor had fallen behind the construction schedule by 16%...which shows that it has neither the ambition nor the determination to expedite the progress of the work.”

The Times also reported that the bureau had informed Kuo Teng Construction in February that delays to the bridge’s construction meant the firm was barred from bidding for government projects for one year.

Public construction commission minister Wu Hong-mo was reported saying most government agencies prefer to choose the bidders that offer the cheapest packages, fearing criticism that otherwise they would be wasting taxpayers’ money.

Wu said his top priority is to make sure government workers are not afraid to hire firms that present the most comprehensive bids, adding that the commission would lay out the types of projects to which this bidding method applies.

Related Content

  • New Zealand ponders tolling new major roads
    July 22, 2024
    NZ Transport Agency Waka Kotahi (NZTA) said it will consider tolling for new Roads of National significance if the government wishes it.
  • VIDEO: Virginia approves Hampton Roads Bridge Tunnel expansion
    December 12, 2016
    The US state of Virginia has approved a US$4 billion project to expand the Hampton Roads Bridge Tunnel close to the city of Norfolk.

    The state has been looking at designs for the past 20 years to improve traffic flow in the area, according to a report in the Virginian-Pilot newspaper. Hampton Roads is a body of water making up one of the world's largest natural harbours. The existing structure is close to the US Navy's Atlantic Fleet home base at Norfolk.
  • Rural roads important to global development
    April 12, 2012
    Maryvonne Plessis-Fraissard highlights that the key importance of rural roads in the context of global development is only now being fully recognised, is not receiving enough attention and is facing vital new challenges Rural roads have only relatively recently received attention in development research. The International Bank for Reconstruction and Development, or World Bank, moved away from the World War II reconstruction mandate during the early 1960s to start, and address, the "Third World" developme
  • CEMCO meets tough VSI crushing challenge
    September 25, 2013
    Quarry firm Blue Mountain Minerals is improving output quality and productivity following the installation of a new CEMCO crusher. The facility is located in the Sierra Nevada foothills in Northern California, around two hours’ drive to the south east of Sacramento. This quarry has been providing customers in California with a variety of limestone and dolomite products for more than 150 years. Blue Mountain is the largest producer of limestone products in northern California and provides quality materia