Skip to main content

Seattle’s Alaskan Way tolls to be kept to a minimum

Drivers could pay as little as US$1 to use Seattle’s 2.7km Alaskan Way tunnel when it opens, likely by the end of the year. The Washington State Department of Transportation, owner of the tunnel, are considering several rates depending on time of day and day of week, according to local media. The DoT said funding for the $3.2 billion viaduct replacement programme comes from state, federal and local sources as well as the Port of Seattle and tolls on drivers using the tunnel. The money will fund tunnel
June 4, 2018 Read time: 2 mins
Low tolls take high priority on Seattle’s soon-to-be-open tunnel replacement for the Alaskan Way viaduct
Drivers could pay as little as US$1 to use Seattle’s 2.7km Alaskan Way tunnel when it opens, likely by the end of the year.

The Washington State Transportation Commission, owner of the tunnel, is considering several rates depending on time of day and day of week, according to local media.

The DoT said funding for the $3.2 billion viaduct replacement programme comes from state, federal and local sources as well as the Port of Seattle and tolls on drivers using the tunnel. The money will fund tunnel maintenance and raise $200 million to repay construction bonds used to build the tunnel.

“State transportation commissioners are intent on charging the lowest possible tolls for the Highway 99 tunnel, so motorists won’t be tempted to divert onto busy downtown Seattle streets,” the WSTC has said.

One option would be to set four rates ranging from $1 on weekends and $1.50 at morning peaks to $2.25 each direction during afternoon rush hour. After the first two years, tolls would increase 3% annually from 2021 to 2025.

Rates are much higher only several kilometres away from the tunnel where drivers pay express-lane tolls as high as $10 to save 20 to 25 minutes along I-405, the Seatle Times reported.

The five tolls on the Highway 520 floating toll bridge alternate through 11 time periods per weekday, ranging from $1.25 to $4.30, with minimal controversy, the Times reported.

Related Content

  • Bomag’s president Ralf Junker puts his faith in BIM
    November 8, 2017
    World Highways recently caught up with Ralf Junker, president of BOMAG Group, during the company’s Innovation Days at its headquarters in Germany. David Arminas reports. Ralf Junker hasn’t forgotten his roots. You can put as much machine control as you like on a piece of construction equipment but all that high-technology is for nothing if the build quality isn’t there. Junker knows something about build quality. When he started at BOMAG in 1988, he was in the welding shop, eventually becoming supervisor
  • Istanbul’s new tunnel connection opens
    December 22, 2016
    Istanbul’s new Eurasia Tunnel has been opened for traffic, connecting the Asian and European side of the Bosporus strait. The new link will help reduce congestion in Istanbul and should cut travel times to just 15 minutes for drivers using the link. The tunnel runs from Kazlıçeşme on the European side to Göztepe on the Asian side of the Bosporus strait. The new route is 14.5km long, with a 5.4km tunnel stretch lying up to 106m below the Bosporus Strait and features two decks for vehicles and it is expect
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Virginia highway contract awarded
    October 8, 2021
    A major Virginia highway contract has been awarded.