Skip to main content

Poland bidders angry over Astaldi win for Warsaw Ring Road work

Four groups that made bids for building the southern section of the Warsaw Ring Road have filed complaints about how the national road authority GDDKiA chose Astaldi as the winner. Companies appealing to the National Board of Appeal (KIO) are Impresa Pizzarotti, Porr Polska, Salini Polska and IDS-BUD. The offer made by Italian company Astaldi was at least 25% less than the estimated €391 million cost of the project, according to Polish media reports. World Highways reported in February that Astaldi
June 18, 2015 Read time: 2 mins
Four groups that made bids for building the southern section of the Warsaw Ring Road have filed complaints about how the national road authority 1361 GDDKiA chose 1324 Astaldi as the winner.

Companies appealing to the National Board of Appeal (KIO) are Impresa Pizzarotti, 3976 Porr Polska, Salini Polska and IDS-BUD.

The offer made by Italian company Astaldi was at least 25% less than the estimated €391 million cost of the project, according to Polish media reports.

World Highways reported in February that Astaldi’s €290 million bid was the lowest offer for the project. The work calls for a 4.6km section of the route to be constructed, including what will be Poland’s longest road tunnel once complete.

The dispute comes just as an engineering and construction group led by Astaldi signed the largest construction financing package in Turkey’s history – US$5 billion - to refinance existing loans and provide new funding for a $6.4 billion toll road.

Astaldi and its Turkish partners 3338 Nurol Insaat, 3340 Makyol Insaat and Ozaltin Insaat agreed to the loan from nine lenders, including 3321 Deutsche Bank for the 400km road and suspension bridge across the Sea of Marmara. Financial news agency Bloomberg said the loan is the largest for a project in Turkey.

Astaldi said in a written statement that the new financial package will allow completion of the final portion of the 301km route linking the city of Bursa to the Aegean port of İzmir (Phase 2B) and to refinance the sections under construction for the Gebze-Orhangazi-Bursa link (Phase 1 and Phase 2A).

For more information on companies in this article

Related Content

  • Contractor Strabag unveils optimism with new results
    August 30, 2013
    A note of cautious optimism can be seen at the Austrian contractor Strabag, with the release of its half year results. The company saw turnover of € 5.6 billion for the first half of 2013, a drop of 7 % from the same period for the previous year but with some of this fall coming from weather-related issues that delayed the start of construction acitivity. However the company says that the impact of the weather on its performance should be made up by the year end. Strabag is a major contractor and is Central
  • A1 Upgrade section opens in the UK
    March 27, 2019
    A key section of the UK’s important A1 route is now open to traffic.
  • China funding road work in Nepal
    April 26, 2012
    China is helping provide funding for Nepal's road expansion. The Chinese Government has agreed a deal with the Nepalese Government to expand the Kathmandu Valley ring road. The feasibility study for the project has been completed and design work is currently underway.
  • India’s US$1.7 billion Mumbai Coastal Highway
    March 18, 2024
    India’s US$1.7 billion Mumbai Coastal Highway inaugurated