Skip to main content

Pilosio improves SlabProp range with the SlabProp 2.0

As part of upgrades to the SlabProp range from Pilosio, the SlabProp 2.0 features a new section, resistant and weight optimised The latest addition has a greater range of extraction than the previous model which varies from 145-625cm. It also has greater capacity with values up to 80kN (certified according to EN 16031). Also, connection to truss frames is permitted all along the prop in order to assemble load-bearing towers with high capacity. This prop is made of aluminium type 6005A for a good ca
July 8, 2016 Read time: 2 mins
As part of upgrades to the SlabProp range from 7163 Pilosio, the SlabProp 2.0 features a new section, resistant and weight optimised

The latest addition has a greater range of extraction than the previous model which varies from 145-625cm. It also has greater capacity with values up to 80kN (certified according to EN 16031).

Also, connection to truss frames is permitted all along the prop in order to assemble load-bearing towers with high capacity.

This prop is made of aluminium type 6005A for a good capacity-to-weight ratio. Pilosio says that this reduces number of post shores required resulting in labour cost savings. It can also be used as single post shore, in combination with other props one on top of the other to reach greater heights or connected with truss frames to create shoring towers.

The SlabProp 2.0 is totally compatible with Slabform and Liteform panel system.

The range of products also includes a series of extension props to increase the flexibility of the system: lengths are 0.5m up to 1.5m. Connecting frames are available in different lengths, from 75-305cm. They can be attached to the inner tube or to the outer tube. Both sections allow quick connection with the hook.

Bearing towers can be easily assembled flat on the ground.

For more information on companies in this article

Related Content

  • New soil compactor launches from key manufacturers
    May 30, 2013
    Major manufacturers continue to develop new soil compactor models - Mike Woof reports. Innovations in machine design are being seen in the soil compaction sector from a number of major firms. As in other equipment sectors, new engine emissions legislation has played a huge role in driving the latest design changes. Europe, the US and Japan are rolling in the new Tier 4 Final/Stage IV legislation on noise and exhaust emissions which will be phased in across power output classes from the start of January 2014
  • Proper GPR Surveying Techniques
    May 10, 2019
    A sustainably good road surface often depends on how well understood is the ground underneath the road’s route. Brian Jones* offers some best practice and advice for getting the most from ground-penetrating radar investigations Ground-penetrating radar (GPR) is one of the most accurate non-destructive testing (NDT) methods available. To get the most from GPR surveying, it is absolutely essential to understand how GPR tools work and follow best practices when conducting surveys. Key areas to be aware o
  • A rejuvenator derived from pine trees and natural asphalt
    November 20, 2015
    This month we look at two additives from natural sources: a rejuvenator derived from pine trees and naturally occurring asphalt - Kristina Smith writes One of the problems experienced with pavements containing RAP is that, although they exhibit good rutting resistance, they often fail early due to fatigue cracking. Biorefiner Arizona Chemical has just unveiled independent test results for its SYLVAROAD RP1000 Performance Additive that it says demonstrate that the rejuvenator can help create mixes that ar
  • Nigeria’s giant city Lagos to benefit from a new cable-stayed bridge
    September 19, 2012
    The first cable-stayed bridge in Nigeria will link two districts of the megacity of Lagos Nigeria’s first cable-stayed bridge, the Lekki Ikoyi Bridge in the megacity of Lagos is scheduled for completion at the end of 2012. Its striking 90m high pylon characterises the appearance of the 1,357m long bridge, which will connect two districts of the West African city, Lekki on the Lekki Peninsula and Ikoyi on Lagos Island.