Skip to main content

New viaduct proposed for Ecuador

A new road connection is being put forward for Ecuador, with the project expected to cost in the region of US$1.14 billion. The 44km connection would include a viaduct section over the Guayas River and connect the southern part of Guayaquil with Duran. The contract would require the road and viaduct to be constructed within a four year timeframe and would allow for a 40 year period to maintain the route.
October 9, 2018 Read time: 1 min
A new road connection is being put forward for Ecuador, with the project expected to cost in the region of US$1.14 billion. The 44km connection would include a viaduct section over the Guayas River and connect the southern part of Guayaquil with Duran. The contract would require the road and viaduct to be constructed within a four year timeframe and would allow for a 40 year period to maintain the route.

Related Content

  • Key link on track in US
    April 25, 2012
    Work on the DFW Connector project in Texas is now 50% complete. When it is finished, the DFW Connector project will reduce congestion for drivers in the Dallas-Fort Worth area. The DFW Connector is the largest investment of American Recovery and Reinvestment Act funding, US$260 million, in a highway project.
  • Astaldi wins Polish S7 contract between Naprawa and Skomielna Biala
    March 3, 2016
    Astaldi, a global construction company based in Rome, has won a contract worth nearly €222 million for construction of Poland’s S7 dual carriageway between Naprawa and Skomielna Biala. The contract, awarded by the Polish General Directorate for National Roads and Motorways (GDDKiA), includes construction of a 2km tunnel under the Lubon Maly massif, 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when completed, will ru
  • Cowi appointed advisor for Bar-Boljare highway in Montenegro
    November 16, 2017
    Consulting engineer Cowi has been appointed adviser on bridge and tunnel work for the Smokovac-Uvac-Matesevo section of the 170km Bar-Boljare highway in Montenegro. The Smokovac-Uvac-Matesevo section is a priority project for the Bar-Boljare highway project that will eventually run north to south from Montenegro's main sea port of Bar to the Serbian border. Cowi was awarded the work from main project contractor China Road and Bridge Corporation.
  • Italian highway viaduct collapses
    November 27, 2019
    Heavy rain is thought to be the cause for the collapse of a section of highway viaduct in Italy.