Skip to main content

New South Wales is seeking financial packers for WestConnex in Sydney

Investment bank Goldman Sachs will soon be sending out expressions of interest for backers to finance Australia’s biggest road deal, the three-stage WestConnex project to be rollout by the New South Wales government. According to a report by The Australian newspaper, initially around US$1.17 billion will be needed for the first phase of the Sydney toll road project. The first phase will likely cost between nearly $2.35 billion and $3.9 billion. Total cost of all three phases over 10 years could be as
June 19, 2015 Read time: 3 mins
Investment bank 3347 Goldman Sachs will soon be sending out expressions of interest for backers to finance Australia’s biggest road deal, the three-stage WestConnex project to be rollout by the New South Wales government.

According to a report by The Australian newspaper, initially around US$1.17 billion will be needed for the first phase of the Sydney toll road project. The first phase will likely cost between nearly $2.35 billion and $3.9 billion.

Total cost of all three phases over 10 years could be as much as $11.6 billion and the 33kmk of new roads will connect the south-west and western parts of Sydney with the airport, city and port.

Among the Australian lenders expected to be interested in the public-private partnership are Commonwealth Bank, ANZ, Westpac and NAB.

The Australian reported that details will soon emerge surrounding traffic forecasts on the first phase, along with the award of construction contracts.

Exactly what shape the PPP contract will take remains to be seen. It is a sensitive issue, The Australian said, since the collapse of the two PPP toll projects in Sydney. Both Lane Cove Tunnel, a 3.6km twin-tunnel, and Cross City Tunnel, a 2.1km twin-tunnel, went into receivership when traffic forecasts proved inaccurate.

The Australian report said one PPP option is for a shadow toll, where construction company receives a payment per driver from the government.

Earlier this month 3260 World Highways reported that a joint venture featuring 4755 John Holland, 1026 Samsung C&T and 2685 Leighton Contractors had secured a deal to build and design Sydney’s M4 East motorway.

The M4 East is expected to be completed in 2019 when it will form part of a project to build the WestConnex road tunnel.

Last December, Duncan Gay, roads minister of New South Wales, announced changes to the third phase of the WestConnex motorway. Tunnel will be 8km, around 1km longer than initially planned.

However, the changes likely won’t add to the overall price tag for the project, according to the NSW government. The third stage would cover the route between Haberfield and St. Peters and be constructed between 2018 and 2023. The tunnel will be linked to two other large motorway tunnels that include an M4 extension to Harbefield and M5 East tunnel to St. Peters.

Works to build WestConnex will start next year with the $3.3 billion widening and extension of the M4 to four lanes each way from Parramatta to Haberfield, including a tunnel beneath-Parramatta Road.

For more information on companies in this article

Related Content

  • Ballast Nedam, Deme and Macquarie win Blankenburgtunnel tender
    July 31, 2017
    Dutch construction company Ballast Nedam along with Belgian dredging company Deme and Australian investment bank Macquarie have won the Blankenburgtunnel tender in the Netherlands. The consortium - BAAK Blankenburg-Verbinding - will build the tunnel under the Nieuwe Waterweg river west of Vlaardingen, a city in southern Holland and on the north bank of the river Nieuwe Maas where it meets the Oude Maas.
  • Testing and striping underway for Seattle’s Alaskan Way tunnel
    October 18, 2018
    Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems.The client, Washington State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways. STP said that testing could be complete by late September and the tunnel could open as soon as this fall after an approximate three-w
  • Transurban to test Melbourne drivers in road trials, including tolls
    June 23, 2015
    Melbourne’s road users are the focus of a year-long study into what options are possible for funding road infrastructure projects including various user-pays models. The study headed by Australian toll roads operator Transurban will conducted across Melbourne’s entire road network to see how drivers react to tolling and other road-use models such as charging motorists for each kilometre travelled, a charge to access roads, annual fixed costs per kilometre on expected usage and price per trip. It will al
  • Texas highway upgrade commencing
    May 11, 2021
    A new Texas highway upgrade project is commencing.