Skip to main content

New bridge project to be built in Argentina

A new bridge project is being planned in Argentina. The new link will connect Parana and Santa Fe. Rivers to be crossed between Parana and Sante Fe include the Parana River, the Colastine River and the Sante Fe River, although it is not yet clear which route will be used. The project is expected to cost from US$600-800 million. This will be included in the Argentinian Government’s 2019 budget. The tender process may commence in October 2018. The work will be carried out under the PPP model.
September 21, 2018 Read time: 1 min

A new bridge project is being planned in Argentina. The new link will connect Parana and Santa Fe. Rivers to be crossed between Parana and Sante Fe include the Parana River, the Colastine River and the Sante Fe River, although it is not yet clear which route will be used. The project is expected to cost from US$600-800 million. This will be included in the Argentinian Government’s 2019 budget. The tender process may commence in October 2018. The work will be carried out under the PPP model.

Related Content

  • International firms compete in US bridge project tenders
    May 2, 2012
    The Spanish construction firm ACS is tendering for the construction and operation of four bridges in the US. The firm is tendering in partnership with some other US and international firms for some of the projects, which are worth a total of US$11.4 billion. The Tappan Zee project is expected to cost $5 billion and the deal will be for a design and construction contract. The bridge will be located in New York, is being developed by New York State Thruway Authority and will require two, four-carriageway brid
  • Tendering for new Chile-Argentina tunnel project
    March 21, 2019
    The tender process is open for the study into the planned Paso Las Lenas tunnel to connect Chile and Argentina. The study is expected to cost US$1.55 million and will be paid for by Chile’s O’Higgins Region. The tunnel will be some 11.5km long and the portal in Chile will be at an altitude of 2,020m while the entrance on the Argentine side will be at 2,364m, allowing it to be used throughout the year. The tunnel has an expected pricetag of some $1.67 billion to build, with the countries sharing the construc
  • New Russian highway projects have been proposed
    October 29, 2018
    A proposal has been made to extend a key stretch of Russia’s high speed highway network. The highway connecting Moscow to Kazan would be upgraded and also extended in a bid to improve transport and cut journey times. A new highway section would run from Kazan, in the Volga Region, to Yekaterinburg, in the Urals, with planning already underway. The project also calls for a new highway running from Kazan to Samara to the south. This route will bypass Togliatta and will include the construction of a new bridg
  • Temporary bridge replacement in the US
    July 2, 2019
    A temporary bridge structure provided by Acrow Bridge is maintaining traffic flow for a key crossing in Vermont. The bascule bridge is allowing both vehicular and vessel traffic to pass during the reconstruction work to the North Hero-Grand Isle Drawbridge in Vermont. The US$60 million project involves replacing the historic twin leaf bascule bridge on Lake Champlain. This modular steel bascule bridge is allowing transport to continue to and from the Lake Champlain island towns of North Hero and Grand Isl