Skip to main content

Mongolia key road rebuild project

The highway linking Mongolia’s capital Ulaanbaatar with the city of Darkhan is to be rebuilt. A loan worth from the Asian Development Bank (ADB) will help pay for the project. The work is expected to cost US$225 million and construction work should commence in April 2019. The upgrade to the 205km road will boost both capacity and safety on the route. The city is Mongolia’s third largest and is a centre for industry for the north of the country. As Darkhan is close to the border with Russia lying between Khy
September 10, 2018 Read time: 1 min

Plans are being drawn up in Russia for the road links that will connect with Western China. The work will include rebuilding existing links as well as building new roads, with completion expected by 2024. Four separate road projects are being prioritised. One route will include a highway through Kazan while another will see the construction of a new tolled highway.

Related Content

  • US$1 billion bridge project for Ecuador
    June 7, 2024
    A new US$1 billion bridge project is planned for Ecuador.
  • Weigh-in-motion key to maximising road life
    February 24, 2012
    The market and technology for weigh-in-motion systems continues to evolve – Mike Woof writes. for both mature and developing highway infrastructure networks, traffic densities play an important role in determining road wear and life. Monitoring traffic volumes and individual vehicle weight is crucial for ensuring roads can cope in the long term and that maintenance can be planned, while the problem of overloading can be eliminated.
  • Cairo’s massive new bridge
    May 22, 2019
    Egyptian capital Cairo is already benefiting from the opening of a massive new bridge. features six lanes in either direction, making it the world’s widest suspension bridge. This bridge is one of several forming part of the new highway running across Egyp
  • Nicaragua road project funding deal
    February 1, 2018
    Nicaragua’s Ministry of Transport and Infrastructure (MTI) is setting out its road development programme for 2018. In all the plans call for the construction of 171km of roads. Work will be completed for the road from Mulukuku to Siuna, with the first 23km stretch due to open in September 2018 and the remaining 21.5km expected in December 2018. Meanwhile the road from Nueva Guinea to San Francisco should be complete by November 2018. Work started on these two routes in 2016. The project also calls for